2019 Flood Recovery, Stormwater Pumping Station Replacement
Mills-Fremont Drainage DistrictIowa
The Mills-Fremont Drainage District will hold a public hearing on November 24, 2026, to review the contract documents and estimated cost for the 2019 Flood Recovery, Stormwater Pumping Station Replacement. The project includes construction of a 32,000 gpm stormwater pumping system along the Missouri River Levee, with scope covering pump and motor installation, elevated steel structure, 36-inch discharge piping, electrical and control systems, and fill material placement. Sealed bids are required.
On PublicBidSearch: the newspaper notice for this bid.
Steps to Bid
- 1
Attend the public hearing on November 24, 2026, at 8:15 a.m. at the Mills County Courthouse, 2nd Floor Courtroom, 418 Sharp Street, Glenwood, IA 51534, to review the contract documents and estimated cost. by Nov 24, 2026, 8:15 AM
- 2
Submit sealed bids for the work.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The hearing will take place at 8:15 a.m. on Tuesday, November 24, 2026, in the Mills County Courthouse, 2nd Floor Courtroom, 418 Sharp Street, Glenwood, Iowa 51534. Sealed bids for the work are to be submitted.
Similar open bids
- Westlawn Place Area Utility Improvements - Phase 2B — Ankeny, City of
- RCB Culvert Replacement - Twin Box - On 16 AVE, Over SPRING CK, S30 T86 R11 (Benton County) — Iowa DOT
- RCB Culvert Replacement - Twin Box on Dogwood Road over Mink Creek — Iowa DOT
- East Main Tile Repair, Drainage District No. 129 — Drainage District No. 129, East Main Tile Repair -18203-…
- Notice to Bidders: East Main Tile Repair Drainage District No. 129, Kossuth County, Iowa — Kossuth County
Closing this week nearby
- Scott County YJRC Food Supplier and Distributor Extension — closes Nov 20, 2026
- Ellis Blvd NW Levee and Floodwall Improvements — Unit Price Construction Contract — closes Nov 20, 2026
- Bulk Purina Strategy GX Horse Feed Supply — closes Nov 20, 2026
- Salt Brine Production System Fabrication (Osceola & Washington MG) — closes Nov 20, 2026
- Memorial Union-Structural Repair and AHU2 Replacement-Temporary Shoring — Temporary Shoring, Demolition, and… — closes Nov 20, 2026