Carroll Middle School Reroofing Project Phase II

Northwest Allen County School CorporationIndiana

The project will be awarded as a single lump sum bid to a prime contractor. Bids must be submitted by December 3, 2026, at 2:00 p.m. Bidders must be licensed in Allen County, Indiana, and submit a bid security of at least 5% of the base bid. The successful bidder must provide a 100% performance bond and labor and material payment bond. Site walk-throughs are available for prime bidders upon coordination with Dr. Brandon Bitting. Bidding documents are available from Eastern Engineering Supply.

On PublicBidSearch: the newspaper notice and the agency contact (name, email and phone) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 3, 2026
Time stated in bid documents
Dec 3, 2026, 2:00 PM Eastern Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Required submission items
3 items · full checklist with Pro

Steps to Bid

  1. 1

    Obtain the complete bidding documents from Eastern Engineering Supply at 1239 Wells Street, Fort Wayne, IN 46808.

  2. 2

    Conduct a site walk-through at Carroll Middle School, coordinated in advance with Dr. Brandon Bitting at 260-637-3155.

  3. 3

    Review all construction drawings, specifications, and instructions to bidders.

What you'll need

Submission

Mail, Hand delivery

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 3-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project consists of work necessary to reroof Carroll Middle School Phase II as shown in the construction documents. Bids will be received on a lump sum basis, with each proposal including all labor, materials, and services necessary to complete the project in strict accordance with the construction drawings. (local time). Proposals must be addressed to Dr. All bids received after the specified time will be returned unopened. Complete sets of bidding documents may be obtained from Eastern Engineering Supply, 1239 Wells Street, Fort Wayne, IN 46808. The contractor is responsible for the cost of all bid documents. Each bid must be accompanied by bid security of at least 5% of the base bid amount, in the required form and submitted per the Instructions to Bidders. No bid may be modified, withdrawn, or canceled for 60 calendar days after the bid receipt date. Prime bidders may schedule a site walk-through by contacting Dr. Brandon Bitting at 260-637-3155. Bidders are responsible for conducting a thorough inspection of the job site, existing conditions, and all drawings and specifications. Bidders represent that they have included all required elements in their bid and have no unresolved questions regarding the bid documents. The notice was published in The Journal Gazette on November 11, 2026 (1st) and November 18, 2026 (2nd).

Key dates

Bids due
Dec 3, 2026

Similar bids in Indiana

Closing soon in Indiana