Construction of 0.161 Miles of Bridge & Approaches on Buckley Road, LSBP-51(16)
Newton CountyMississippi#LSBP-51(16)
This solicitation invites sealed bids for the construction of 0.161 miles of bridge and approaches on Buckley Road in Newton County, Mississippi, under the Local System Bridge Program (LSBP-51(16)). Work includes roadway construction, bridge structural elements, excavation, earthwork, paving, erosion control, and traffic management. Bids must be submitted by 10:00 A.M. on Monday, December 18, 2026, to the Board of Supervisors in Decatur, Mississippi. The solicitation is issued by the Office of State Aid Road Construction and County Board of Supervisors.
On PublicBidSearch: the newspaper notice for this bid.
Overview
- Due
- Dec 18, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 18, 2026, 10:00 AM Central Time
- Submission
- mail, hand delivery
Scope of work
- Remove railroad flat car bridge at station 14+90.04
- Install 18-inch reinforced concrete pipe, Class III, 72,000 LF
- Install 14-inch and 18-inch prestressed concrete piling, 680,000 LF and 855,000 LF
- Install 18-inch pre-formed pile holes, 541,000 LF
- Implement erosion control measures including geotextile, silt fence, wattles, and seeding
Steps to Bid
- 1
Submit a sealed bid to the Board of Supervisors in Decatur, Mississippi, by 10:00 A.M. on Monday, December 18, 2026. by Dec 18, 2026, 10:00 AM
What you'll need
Submission
Mail, Hand delivery
How to submit
Bids must be sealed and submitted in person or by mail to the Board of Supervisors in Decatur, Mississippi, by 10:00 A.M. on Monday, December 18, 2026.
In person/mail: Board of Supervisors of Newton County, Mississippi, Decatur, Mississippi
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Principal items of work include: roadway construction (clearing and grubbing, removal of railroad flat car bridge at station 14+90.04, removal of pipe (all sizes), unclassified excavation (FM), borrow excavation (F.M.E., contractor furnished, Class 9), crushed stone size 825 95, 18-inch reinforced concrete pipe, Class III, 72,000 linear feet, guard rail W-beam, 75,000 linear feet, guard rail bridge end section, Thrie beam, 4,000 units, guard rail terminal end section, 4,000 units, roadway construction surveying, right-of-way markers (Type II), 10,000 units, maintenance of traffic, 1,000 linear feet, additional construction signs, 0.000 square feet, reflectorized traffic object marker (encapsulated lens, Type 3), 4,000 units, reflectorized traffic delineator sign (encapsulated lens), 18,000 units, geotextile under bridge end treatment, non-woven, Type V, AOS < 0.43, 168,000 square yards, erosion control (agricultural limestone, 4,000 tons, commercial fertilizer 13:13:13, 2,000 tons, seeding, 2,000 acres, vegetative materials for mulch, 4,000 tons, solid sodding, 50,000 square yards, temporary grassing, 2,000 acres, Portland cement concrete paved ditch, 5,750 cubic yards, erosion mat, 39,000 square yards, temporary silt fence Type II, AOS 0.15–0.84, 1,837,000 linear feet, wattles 20-inch, 300,000 linear feet). Bridge items include: test pile, 2,000 units, conventional static pile load test, 0.000 units, 14-inch prestressed concrete piling, 680,000 linear feet, 18-inch prestressed concrete piling, 855,000 linear feet, 18-inch pre-formed pile holes, 541,000 linear feet.
Key dates
- Bids due
- Dec 18, 2026, 10:00 AM CT
More from this agency
- Invitation for Bids — Newton County, Mississippi · closes Dec 7, 2026
Similar bids in Mississippi
- COUNTY WIDE BRIDGE REPLACEMENT PROJECT - CONTRACT #8 · closes Dec 2, 2026
- County Wide Bridge Replacement Project - Contract #2 · closes Dec 2, 2026
- Construction of 0.181 Miles of Bridge and Approaches on CR 547, Project No. SAP-42(69), Leflore County, Mississippi · closes Dec 7, 2026
- Bid for FY 2027 Bridge & Road Material ETC · closes Dec 7, 2026
- County Wide Bridge Replacement Project - Contract #2 · closes Dec 2, 2026
Closing soon in Mississippi
- Erosion Control Project – USDA Emergency Watershed Protection Program, Cold Creek Hollow Site · closes Dec 1, 2026
- Three (3) New Hydraulic Excavators with Trade-In · closes Dec 2, 2026
- Purchase of Various Sizes of Plastic Culverts · closes Dec 4, 2026
- Emulsified Asphalt CSR-2 (per gallon) · closes Dec 4, 2026
- Gravel, Sand, and Dirt (Wash Rock) · closes Dec 4, 2026