OpenConstructionCloses Dec 10, 2026

Cornerstone Drive Bridge Replacement Project

Maidencreek Township of Berks CountyPennsylvania

Work includes streambed gravel bar removal, embankment restoration, waterline relocation, concrete utility duct bank installation, roadway reprofiling, stormwater inlet installation, and swale construction. A pre-bid meeting on December 2, 2026, at 11:00 AM is mandatory. A 10% bid bond is required. The contract must be completed by May 14, 2027, with $500/day liquidated damages for delay. The project is subject to the Pennsylvania Prevailing Wage Act. The Public Works Employment Verification Form must be included.

On PublicBidSearch: the newspaper notice and the agency contact (name, email and phone) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 10, 2026
Time stated in bid documents
Dec 10, 2026, 6:00 PM Eastern Time
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Required submission items
3 items · full checklist with Pro

Scope of work

  • Replace two 13' metal arch culverts with a 20'-7” Contech Aluminum Arch Culvert
  • Remove gravel bar from stream channel
  • Restore downstream embankments
  • Relocate waterline across stream
  • Install concrete utility duct bank across stream
  • Reprofile roadway to accommodate new culvert

Steps to Bid

  1. 1

    Obtain proposal documents from LTL Consultants, Ltd. via email ([email available with Pro]) or phone (610-987-9290) for free, or request paper copies for $35 plus $10 shipping.

  2. 2

    Ensure the proposal includes the Public Works Employment Verification Form completed by the bidder. by Dec 10, 2026, 6:00 PM

What you'll need

Submission

Mail, Hand delivery

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 7 watch-outs that disqualify bidders
  • The 3-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Bids will be publicly opened and read at the same time. The Board of Supervisors will consider proposals and may award a contract at their meeting on the same day and time. The project involves replacing two existing 13' metal arch culverts carrying an Unnamed Tributary (UNT) to Willow Creek under Cornerstone Drive with a 20'-7” Contech Aluminum Arch Culvert and wingwalls. Proposal documents are available from LTL Consultants, Ltd., One Town Centre Drive, Oley, PA 19547. Electronic documents are free. Request electronic copies via email to [email available with Pro] or by phone at (610) 987-9290. Proposals must include a bid bond equal to 10% of the total proposal amount. Proposals are valid for 90 days from the date of opening. A maintenance bond equal to 15% of the contract price, valid for 18 months after substantial completion, is required. The township reserves the right to reject any or all bids or portions thereof. The project must be substantially complete by Friday, May 14, 2027. Work within the stream channel is prohibited from October 1 to December 31 under USFWS regulations. No stream or E&S bypass pumping work may begin before January 1, 2027. Proposals must include the Public Works Employment Verification Form completed by the bidder.

Key dates

Pre-bid meeting
Dec 2, 2026, 11:00 AM Eastern Time
Bids due
Dec 10, 2026

Similar bids in Pennsylvania

Closing soon in Pennsylvania