Cowles Drive Reconstruction – Phase 4
Des Moines International AirportDes Moines, Iowa#2024-10-22
2024-10-22. The project includes pavement removal, excavation, backfill, subbase, storm sewer, paving, curbs, sidewalks, shelters, traffic control, erosion control, landscaping, lighting, and signage. Work must begin by August 1, 2027, with two lanes open to traffic by November 5, 2027, and full completion by September 1, 2028. A pre-bid conference is mandatory on November 24, 2026, at 10:30 a.m., in person or virtual. Bidders must submit a completed Bidder Status Form. Bid security is required at 10% of the bid amount, in the form of a cashier’s check, certified check, or bid bond. Performance and payment bonds of 100% of the contract price are required. The lowest responsive and responsible bid will be awarded.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 10, 2026, 1:30 PM CT
- Time stated in bid documents
- Dec 10, 2026, 1:30 PM Central Time
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Documents analyzed
- 1
- Required submission items
- 2 items · full checklist with Pro
Scope of work
- Remove 5,600 SY of pavement
- Excavate 7,000 CY of Class 10 material
- Install 11,700 CY of airport-furnished granular backfill
- Construct 3,300 CY of modified subbase
- Lay 8,300 SY of geogrid
- Install 700 LF of RCP storm sewer
Steps to Bid
- 1
Coordinate a site visit with Bryan Belt at (515) 256-5160 if desired.
- 2
Complete and submit a fully completed and accurate Bidder Status Form with the proposal. Failure to do so may result in the proposal being deemed non-responsive and rejected. by Dec 10, 2026, 1:30 PM
What you'll need
Award method
The lowest aggregate sum proposal submitted from those bidders the Owner confirms as being responsive and responsible.
Submission
Mail, Hand delivery
NAICS
237130, 237199
How to submit
Proposals must be sealed and submitted in person or by mail to the address above. The bid must include a completed Bidder Status Form and bid security. Bids received after 1:30 p.m. on December 10, 2026, will not be considered and will be returned unopened.
In person/mail: Executive Director, Des Moines International Airport, 2nd Floor, Room 207, 5800 Fleur Drive, Des Moines, Iowa, 50321
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 6 watch-outs that disqualify bidders
- The 2-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Scope includes: 5,600 square yards of pavement removal; 7,000 cubic yards of Class 10 excavation; 11,700 cubic yards of airport-furnished granular backfill; 3,300 cubic yards of modified subbase; 8,300 square yards of geogrid; 700 linear feet of reinforced concrete pipe storm sewer; 6,200 square yards of hot-mix asphalt pavement; 3,600 linear feet of PCC curb and gutter; 3,200 square yards of PCC sidewalk; installation of canopies and warming shelters; traffic control; erosion control, seeding, and sodding; landscaping and irrigation; street lighting; and roadway signing. A pre-bid conference is scheduled for November 24, 2026, at 10:30 a.m. Site visits may be coordinated with Bryan Belt at (515) 256-5160.
Key dates
- Pre-bid meeting
- Nov 24, 2026, 10:30 AM Central Time
- Bids due
- Dec 10, 2026, 1:30 PM CT
Documents
- Notice_To_Bidders_-_Cowles_Drive_Reconstruction_Phase_4.pdf4 pages
Similar open bids
- 2027 PCC Patching Program Phase 2 — City of West Des Moines
- ADA Curb Ramps 2026 Project — City of Iowa City
- 2027 Pedestrian Crossing Improvements — City of Des Moines
- PCC Sidewalk/Trail in the City of Maxwell (ADA - District 1) — Iowa DOT
- PCC Sidewalk/Trail on N 1st St in Long Grove — Iowa DOT
Closing this week nearby
- Bulk Purina Strategy GX Horse Feed Supply — closes Nov 20, 2026
- Salt Brine Production System Fabrication (Osceola & Washington MG) — closes Nov 20, 2026
- Memorial Union-Structural Repair and AHU2 Replacement-Temporary Shoring — Temporary Shoring, Demolition, and… — closes Nov 20, 2026
- Miscellaneous Inventory for Electric Services — closes Nov 20, 2026
- One (1) Bobcat S570 Skid Steer Loader & Bucket — closes Nov 20, 2026