The Memphis Light, Gas and Water Division is seeking bids for a complete vacuum circuit breaker replacement at the Justin J. Davis Pumping Station. Work includes new conductors, switchgear doors with protection devices, programming and verification of protection systems, and all associated labor, materials, and engineering. A mandatory site visit is scheduled for October 21, 2026.

On PublicBidSearch: the newspaper notice and the agency contact (name, email and phone) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Nov 17, 2026, 4:00 PM CT
Time stated in bid documents
Nov 17, 2026, 4:00 PM Central Time
Submission
mail, hand delivery

Scope of work

  • Replace all medium-voltage switchgear circuit breakers with vacuum circuit breakers at 4.76 kV
  • Install new conductors from transformer to switchgear bus bar
  • Provide new doors with protection devices on all switchgear cubicles
  • Program and verify protection devices on all switchgear cubicles
  • Perform all required short-circuit coordination studies

Steps to Bid

  1. 1

    Attend the mandatory site visit on October 21, 2026, at 9:00 AM at the Justin J. Davis Pumping Station. was Oct 21, 2026, 9:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Submission

Mail, Hand delivery

Get alerts for bids like this

New electrical bids in Tennessee

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

The Memphis Light, Gas and Water Division (MLGW) is soliciting sealed bids for the replacement of existing medium-voltage switchgear circuit breakers at the Justin J. Davis Pumping Station, located at 1800 West Shelby Drive, Memphis, TN 38109. The scope includes full vacuum circuit breaker replacement, new conductors from transformer to switchgear bus bar, new switchgear cubicle doors with protection devices, programming and verification of protection devices, and all supervision, labor, materials, tools, rentals, test equipment, transportation, project management, factory and field engineering, and short-circuit coordination studies as required. Work must be performed in strict compliance with the Contract Documents and Specifications. A mandatory site visit is required on Wednesday, October 21, 2026, at 9:00 AM at the project site. Box 430, Memphis, TN 38101-0430).