Preschool Center Remodel (Project No. 2334) – Sealed Bids
Bourbon CountyKansas#2334
Unified School District No. 234, Fort Scott, Kansas, is soliciting sealed bids for the remodel of the Preschool Center at 902 Horton Ave. Work will be divided into 21 separate trade packages, each to be bid independently. Bidders may submit for one or more packages. The scope includes structural, mechanical, electrical, plumbing, and finish work. Playground improvements are excluded. Bid documents are available at the Board of Education Office and through three plan rooms. Bidders must purchase printed sets from KC Blueprint. A pre-bid meeting is scheduled for November 30, 2026, at 10:00 a.m. at the site; attendance is encouraged. Bids must be submitted by 1:00 p.m. Central Time on December 4, 2026, to Terry Mayfield, Assistant Superintendent, at 424 S. Main, Fort Scott, KS 66701. Questions must be submitted by email to Patrick J. Wood by December 1, 2026. Contracts will be awarded to the lowest responsible bidder on each package. Bids remain valid for 60 days.
On PublicBidSearch: the newspaper notice and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026, 1:00 PM CT
- Time stated in bid documents
- Dec 4, 2026, 1:00 PM Central Time
- Submission
- mail, hand delivery
- Documents analyzed
- 1
Steps to Bid
- 1
Review the full bid package, including drawings and specifications, at the Board of Education Office (424 S. Main, Fort Scott, KS 66701) or through the plan rooms: KCNR, LLC (Wichita, KS), Construct Connect (Cincinnati, OH), or Dodge Data & Analytics (Hamilton, NJ).
- 2
Purchase printed bid documents from KC Blueprint, North Kansas City, MO, or obtain electronic files by emailing the Construction Manager at [email available with Pro].
- 3
Submit questions by email to Patrick J. Wood, Construction Manager, at [email available with Pro]. Questions must be received by December 1, 2026. by Dec 1, 2026
- 4
Prepare and submit a sealed bid for each package bid separately. Each bid must be marked 'Preschool Remodel – Bid Package [No. / Trade]' and addressed to Terry Mayfield, Assistant Superintendent, USD 234, 424 S. Main, Fort Scott, KS 66701. by Dec 4, 2026, 1:00 PM
What you'll need
Award method
Contracts will be awarded by the Board of Education to the lowest responsible bidder on each package.
Submission
Mail, Hand delivery
NAICS
236220, 236110, 238290
How to submit
Bids must be sealed and marked 'Preschool Remodel – Bid Package [No. / Trade]' and addressed to Terry Mayfield, Assistant Superintendent, USD 234, 424 S. Main, Fort Scott, KS 66701. Bids may be withdrawn in writing before the opening time.
In person/mail: 424 S. Main, Fort Scott, KS 66701
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Sealed bids for the remodel of the existing Preschool Center at 902 Horton Ave, Fort Scott, Kansas, are invited from qualified contractors. The work will be bid as 21 separate prime contracts in distinct bid packages, each corresponding to a trade. Bidders may submit offers for one or more packages, but each must be bid separately on its own bid form. The scope includes structural, mechanical, electrical, plumbing, and finish work as detailed in the drawings and specifications prepared by Hight Jackson Associates PA, Architect. The Construction Manager–Agent is Builtwell Consulting, LLC, which will coordinate the work of the separate prime contractors. Bid documents, including drawings and specifications, are available for viewing at the Board of Education Office (424 S. Main, Fort Scott, KS 66701) and through plan rooms: KCNR, LLC (Wichita, KS); Construct Connect (Cincinnati, OH); and Dodge Data & Analytics (Hamilton, NJ). Bidders must purchase printed sets from KC Blueprint, North Kansas City, MO. Electronic files are available upon request from the Construction Manager at [email available with Pro]. Bids received after that time will be returned unopened. All questions must be submitted by email to Patrick J. Wood, Construction Manager, at [email available with Pro], and must be received by December 1, 2026. Bids will remain valid for 60 days after the opening. The Board reserves the right to reject any or all bids and to waive informalities.
Key dates
- Pre-bid meeting
- Nov 30, 2026, 10:00 AM Central Time
- Bids due
- Dec 4, 2026, 1:00 PM CT
Similar bids in Kansas
- Milling and HMA Overlay — Ottawa County, Kansas · closes Dec 16, 2026
- Calvin Hall Second Floor Classroom Renovations · closes Dec 18, 2026
- Wastewater Treatment Plant Improvements — New Aero-Mod SEQUOX Basin, Pre-Engineered Building, and System Upgrades · closes Dec 15, 2026
- Construction of PreCast Concrete Beam Bridge and Guardrail at W 63rd St. S Over Tributary to Spring Creek (B523),… · closes Dec 15, 2026
- Milling and HMA Overlay — Montgomery County, Kansas · closes Dec 16, 2026
Closing soon in Kansas
- Switchgear Transformer Replacement · closes Nov 30, 2026
- Brush Removal - District 1 · closes Dec 1, 2026
- Invitation to Bid: Materials for Emergency Electric Power Restoration and Right-of-Way Clearing, New-Mac Electric Co… · closes Dec 1, 2026
- Automatic Transfer Switch (ATS) Preventive Maintenance and Repair Services, and Isolation Power Panel Inspection at… · closes Dec 4, 2026
- Request for Bids — Repair Projects at Ronda Lane, Ronda Lane Bridge, and Osage Village · closes Dec 4, 2026