OpenConstructionCloses Dec 22, 2026, 2:00 PM CT

Notice to Bidders: Renovation at the West Des Moines Crestview School of Inquiry Building

Education of the West Des Moines Community School DistrictIowa

Franklin Avenue, Clive, Iowa. Scope includes general, mechanical, and electrical construction. Phase 1 must be substantially complete by August 13, 2027; Phase 2 by August 11, 2028. A pre-bid conference is scheduled for 3:00 PM on December 9, 2026, at the project site. Bidders must submit a bid bond of at least 5% of the base price, payable to the District. The successful bidder must provide performance and payment bonds each equal to 100% of the contract price. Bids must remain irrevocable for 30 days. The project is tax-exempt. Bidders must submit a completed Bidder Status Form indicating resident status. The Board may award the contract at a meeting on January 11, 2027.

On PublicBidSearch: the newspaper notice and the agency contact (name and phone) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName and phone — included with ProPro

Overview

Due
Dec 22, 2026, 2:00 PM CT
Time stated in bid documents
Dec 22, 2026, 2:00 PM Central Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery

Steps to Bid

  1. 1

    Review the full bid documents online at Official linkPro or at local builders exchanges and digital plan rooms.

  2. 2

    Obtain the bid documents from Beeline + Blue, 2507 Ingersoll Avenue, Des Moines, Iowa 50312, by calling (515) 244-1611. A deposit is required and refundable if returned in reusable condition within 14 days of award.

What you'll need

Contract duration

Phase 1: June 3, 2027 – August 13, 2027; Phase 2: June 5, 2028 – August 11, 2028

Submission

Mail, Hand delivery

NAICS

236220, 238290

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Phase 1 construction may begin on or after June 3, 2027, and must be substantially complete by August 13, 2027. Phase 2 construction may begin on or after June 5, 2028, and must be substantially complete by August 11, 2028. Bids will be opened publicly immediately after the closing time. Attendance is encouraged but not required. Bidding documents are available online at [link available with Pro] and at various local builders exchanges and digital plan rooms. Bidders must provide a bid bond in the amount of at least 5% of the base price, issued by a surety authorized in Iowa, or a certified check, cashier’s check, or certified share draft from an Iowa bank or credit union. Bids must remain irrevocable for 30 days after submission. The project is tax-exempt; Iowa state sales tax must not be included in bid totals. Bidders shall give preference to products and services produced or grown in Iowa. Resident bidders may receive a preference if the bidder’s home state or country provides equivalent preference to out-of-state bidders. Failure to submit this form may result in rejection of the bid.

Key dates

Pre-bid meeting
Dec 9, 2026, 3:00 PM Central Time
Bids due
Dec 22, 2026, 2:00 PM CT

More from this agency

Similar bids in Iowa

Closing soon in Iowa