Arterial Sidewalks Construction for Sanitary and Improvement District No. 563, Douglas County, Nebraska

Nebraska Public Notice — StatewideNebraska

This solicitation is for the construction of arterial sidewalks and associated storm drainage and erosion control work for Sanitary and Improvement District No. 563 in Douglas County, Nebraska. The scope includes removal of existing sidewalk, excavation, embankment, PCC sidewalk and curb ramp construction, storm sewer installation, silt fencing, erosion control, and temporary traffic control. Proposals must be submitted to Lamp Rynearson in Omaha, Nebraska. The estimated contract value is $410,500.25.

On PublicBidSearch: the newspaper notice and the agency contact (name and email) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Nov 24, 2026, 4:30 PM CT
Time stated in bid documents
Nov 24, 2026, 4:30 PM Central Time
Submission
mail, hand delivery

Scope of work

  • Construct 28,640 SF of 5-inch PCC sidewalk
  • Install 7-inch PCC curb ramp (90 SF)
  • Build 18-inch RCP storm sewer (72 LF)
  • Install silt fence (3,000 LF)
  • Provide temporary traffic control (1 LS)
  • Remove existing sidewalk (155 SF)

Steps to Bid

  1. 1

    Review the full solicitation notice and associated documents (plans and specifications) available at Official linkPro or at the office of Lamp Rynearson.

  2. 2

    Submit sealed proposals to Lamp Rynearson at 14710 West Dodge Road, Suite 100, Omaha, Nebraska, 68154, by 4:30 P.M. on November 24, 2026. by Nov 24, 2026, 4:30 PM

What you'll need

Submission

Mail, Hand delivery

NAICS

237130

How to submit

Proposals must be sealed and submitted in person or by mail to the office of Lamp Rynearson. No electronic submission is specified.

In person/mail: 14710 West Dodge Road, Suite 100, Omaha, Nebraska, 68154

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Sealed proposals will be received at the office of Lamp Rynearson, 14710 West Dodge Road, Suite 100, Omaha, Nebraska, 68154, until 4:30 P.M. on November 24, 2026, for furnishing all labor, tools, materials, and equipment required to construct arterial sidewalks for Sanitary and Improvement District No. 563, Douglas County, Nebraska, as per the plans and specifications available for online download through QuestCDN at [link available with Pro] or at the office of Lamp Rynearson. The work consists of mobilization, removal of existing sidewalk (155 SF), clearing and grubbing (1 LS), embankment using borrow material (925 CY), common earth excavation (833 CY), strip, stockpile, and respread topsoil (2,576 CY), construction of 5-inch PCC sidewalk (28,640 SF), 7-inch PCC curb ramp (90 SF), detectable warning panel (16 SF), seeding (Type A, 2 acres), construction of 18-inch RCP storm sewer (72 linear feet), pipe bedding (72 LF), flared end section (2 units), utility relocation (1 LS), rolled erosion control (1 acre), silt fence (3,000 LF), removal of silt fence (3,000 LF), and temporary traffic control (1 LS). The engineer's estimate of cost (exclusive of engineering, fiscal, legal, interest, and miscellaneous costs) is $410,500.25. Proposals will be publicly opened, read aloud, and tabulated at the time of receipt. The notice was published in the Omaha Daily Record on Tuesday, November 3, 2026.

Key dates

Bids due
Nov 24, 2026, 4:30 PM CT