ODOT Notice to Contractors 26052 - 4 Week (Bid Opening: 12/17/2026)
Oregon Department of Transportation (ODOT) — Highway & Bridge ConstructionOregon#NTC-26052
The Oregon Department of Transportation (ODOT) is soliciting bids for two highway and bridge construction projects under Notice to Contractors 26052. Project 1 in Washington County involves demolition and reconstruction of Hall Boulevard in Beaverton, including earthwork, drainage, concrete paving, and miscellaneous appurtenances. Project 2 in Jackson County covers curb ramp improvements on OR62, OR66, and OR99, with scope including temporary traffic control, pavement repair, concrete curbs, and signage. Both projects require contractors to perform at least 30% of the work using their own workforce. All projects include a fuel escalation clause, comply with 'BUY AMERICA' requirements, and require adherence to Oregon’s minimum wage rates. Bidders must be prequalified with ODOT at least 10 days before the bid closing date. Bids must be submitted electronically via Bid Express or by mail/hand delivery to ODOT in Salem.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 18, 2026
- Submission
- electronic portal, mail, hand delivery
- Documents analyzed
- 1
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Demolish and reconstruct Hall Boulevard in Beaverton, OR
- Install temporary traffic control and signage for 431 ft
- Construct 1,880 ft of concrete curbs and 12,970 ft² of concrete walkways
- Pave 2,570 tons of aggregate base and 1,097 tons of asphalt concrete pavement
- Install 35 bollards, 220 ft² of signs, and 1,830 ft of MMA striping
- Complete work by June 30, 2028
Steps to Bid
- 1
Register and complete prequalification with ODOT at least 10 calendar days before the bid closing date. by Dec 7, 2026
- 2
Review project plans, specifications, and bid booklets via eBIDS at Official linkPro
- 3
Submit questions to the project manager via email for technical clarifications. by Dec 10, 2026, 11:59 PM
- 4
Submit bid electronically via Bid Express (Official linkPro) or by mail/hand delivery to ODOT in Salem before 9:00 a.m. on December 17, 2026.
What you'll need
Insurance
RequiredAll projects have minimum wage rate requirements. Wage publications are published on the Agency's website at [link available with Pro]
Prequalification
RequiredContract duration
June 30, 2028 (Project 1); September 9, 2027 (Project 2)
Submission
Electronic portal, Mail, Hand delivery
NAICS
237310
How to submit
Submit electronic bids via Bid Express (Official linkPro) before 9:00 a.m. on December 17, 2026. Paper bids must be delivered by 9:00 a.m. on the same day. For mail or parcel delivery, send to the address above. For hand delivery, use the ODOT Procurement Bid Box in the 1st floor lobby at the same address. Bids submitted after 9:00 a.m. will not be accepted.
In person/mail: Oregon Department of Transportation, Procurement Construction Contracts, MS #33, 355 Capitol Street NE, Salem, Oregon 97301
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 6 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
This notice contains multiple highway and bridge construction projects advertised for bid. Project 1: Washington County – Beaverton Downtown Loop: Phase 1 Demo Section of Hall Boulevard in Beaverton. Scope includes temporary signage (431 ft), sequential advance traffic signs (1 ea), flagging (200 hours), temporary curb ramps (4 ea), temporary drainage facilities, 77 cubic yards of compacted erosion blanket, 1,675 tons of contaminated soil disposal, 1,000 gallons of contaminated groundwater removal, abandonment of monitoring wells, 58 inlet protection devices, construction survey work, 3,609 linear feet of sawcut, 2,216 cubic yards of excavation, 710 square yards of subgrade stabilization, 2,960 square yards of geotextile, 410 feet of video inspection, 1,109 feet of pipe, 30 feet of trench drain, 8 concrete manholes, 6 concrete inlets, 30 adjustable boxes, 2 adjustable inlets, 9 fill abandoned structures, 6 adjustable manholes, 350 square yards of trapezoidal resurfacing, 900 square yards of concrete pavement repair, 2,570 tons of aggregate base, 1,097 tons of asphalt concrete pavement, 9 asphalt approach sections, 810 square yards of CRCP, 1,880 feet of concrete curbs, 224 square feet of concrete islands, 3,310 square feet of concrete driveways, 12,970 square feet of concrete walkways, 80 square feet of concrete surface, 625 square feet of truncated domes, 35 bollards, 1,830 linear feet of MMA striping, 2.4 cubic yards of concrete in sign supports, 1,279 pounds of steel in sign supports, 220 square feet of signs, pole foundations, luminaires, lamps, ballasts, switches, condensers, wiring, light poles and arms, 1 flash beacon installation, 10 water quality structures, 0.03 acre seeding, 145 cubic yards of topsoil, 15 cubic yards of soil conditioning, 28 trees, 321 shrubs, 395 ground cover plants, 18 cubic yards of mulch, 18 tree gates, 1,115 feet of root barriers, 2 benches, 2 bike racks, 3 litter receptacles, soil cells, irrigation system, 4 hydraulic assemblies, 3 movable extensions. Completion time: June 30, 2028. Class of Work: A) Earthwork and Drainage, or B) Combination of Portland Cement Concrete Paving and Miscellaneous Highway Appurtenances. Project 2: Jackson County – Jackson County Curb Ramps Phase 4 Project on OR62, OR66, and OR99 beginning in Eagle Point. Scope includes temporary signage (1,385 ft²), sequential advance signs (3 ea), PCMS (2 ea), flagging (1,900 hours), flag station lights (8 ea), temporary traffic signals (5 ea), 650 ft of PCD, 24 temporary curb ramps, 1,880 ft² of temporary walkways, 50 ft of sediment fence, 26 inlet protection devices, 490 ft of sediment barriers, construction survey work, 5,300 ft of sawcut, 1 concrete manhole, 3 concrete inlets, 4 adjustable boxes, 16 adjustable inlets, 6 adjustable manholes, 2,000 tons of aggregate base, 900 tons of asphalt concrete pavement, 690 ft² of asphalt surface pavement, 13,000 ft² of pavement repair, 3,200 ft of concrete curbs, 110 ft² of concrete islands, 17,450 ft² of concrete walkways, 1,000 ft² of truncated domes, 1,430 ft of thermoplastic striping, 12 sidewalk closures, removal and reinstallation of existing signs, 60 board feet of wood sign posts, 0.3 cubic yards of concrete in sign supports, 253 lbs of steel in sign supports, 36 ft² of signs, 9 traffic signal modifications, 2 flash beacon installations, 0.1 acre seeding, 60 cubic yards of topsoil, 5 cubic yards of bark mulch, 3 tons of rock mulch, 190 ft² of weed control geotextile. Completion time: September 9, 2027. All federally funded projects must comply with 'BUY AMERICA' requirements.
Key dates
- Questions due
- Dec 10, 2026, 11:59 PM Pacific Time
- Bids due
- Dec 18, 2026
Documents
- Notice_26052_December_17_4_-_week_ad.pdf2 pages
More from this agency
- Highway and Bridge Construction Projects — Yammill County, OR99W Corridor Safety & Intersection Improvements — closes Nov 20, 2026
- I-84 (Westbound): Union Pacific Railroad Bridge (Hood River) – Highway and Bridge Construction — closes Nov 20, 2026
- ODOT Notice to Contractors NTC-4 - - (Bid Opening: 12/3/2026) — closes Dec 4, 2026
- ODOT Notice to Contractors NTC-2 - - (Bid Opening: 12/3/2026) — closes Dec 4, 2026
- ODOT Notice to Contractors NTC-0 - - (Bid Opening: 12/3/2026) — closes Dec 4, 2026
Similar open bids
- Manzanita Entry Canopy — High Desert ESD
- ODOT Notice to Contractors 26051 - 5 Week (Bid Opening: 12/17/2026) — Oregon Department of Transportation (ODOT)
- RFP Sidewalk Art Stencils — City of Portland
- Baker Bay Vault Toilet Improvements — Lane County, Oregon
- Southwest Oregon 2024-2027 ADA Curb Ramps, Phase 2 — Various Highways — Oregon Department of Transportation (ODOT)
Closing this week nearby
- Oregon Land Use Hearings Officer Services — closes Nov 19, 2026
- Alternative Procurement for Collaborative Peer-to-Peer Learning Annotation Tool — closes Nov 19, 2026
- Pharmacy Benefit Management Services (PBM) – Town of Delight, AR — closes Nov 19, 2026
- Guardrail and Appurtenances Package – Type 2A, 12-Gauge, for Clatsop County Public Works — closes Nov 19, 2026
- ODVA Roseburg Veterans Home CM/GC — closes Nov 19, 2026