Operation and Maintenance of Bulk and Satellite Fuel Farm Wastewater Treatment Facilities at John F. Kennedy International Airport, Jamaica, NY – Four (4) Year Contract
Port Authority of NY & NJQueens, New York#6000003484
Contractor to operate and maintain wastewater treatment systems at JFK Airport’s fuel farms for four years. Services include 24/7 monitoring, maintenance, emergency response, and compliance reporting. Must be licensed and experienced in wastewater treatment operations. Site visit and pre-bid meeting required.
Overview
- Due
- Sep 28, 2026
- Time stated in bid documents
- Sep 28, 2026, 11:59 PM Eastern Time
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Contract term
- four (4) years + two (2) one-year renewal terms
- Documents analyzed
- 1
- Required submission items
- 6 items · full checklist with Pro
Scope of work
- Conduct routine testing, chemical dosing, and sludge handling
- Ensure compliance with NPDES and EPA regulations
- Submit monthly performance and compliance reports
Steps to Bid
- 1
Register on the Port Authority's Euna portal and obtain a bidder account.
- 2
Review the full solicitation document, addenda, and Q&A on the Port Authority website and Bonfire. was Sep 23, 2026, 10:30 AM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Attend the mandatory pre-bid meeting on September 23, 2026, at 10:30 AM EST. was Sep 23, 2026, 10:30 AM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Attend the site visit on September 24, 2026, at 9:00 AM EST. was Sep 24, 2026, 9:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 5
Submit the complete bid package via the Euna electronic portal by 11:59 PM on September 28, 2026. was Sep 28, 2026, 11:59 PM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Insurance
RequiredGeneral Liability: $2M per occurrence / $4M aggregate; Workers’ Compensation: Statutory limits; Professional Liability: $1M per claim.
Prequalification
Not requiredContract duration
Four (4) years with two (2) one-year renewal options
Award method
Lowest Responsible Bidder
Submission
Electronic portal
NAICS
561720, 561730
How to submit
Submit one electronic copy via the Euna portal. No hard copies accepted. All documents must be in PDF format. Include bid bond, technical proposal, and compliance checklist. No physical delivery allowed.
Get alerts for bids like this
New sewer and wastewater bids in New York
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
The Port Authority of New York and New Jersey seeks a contractor to provide full operation and maintenance services for bulk and satellite fuel farm wastewater treatment facilities at John F. Kennedy International Airport, Jamaica, NY. The contract term is four (4) years with two (2) one-year renewal options. Services must meet federal, state, and local environmental regulations, including NPDES permit requirements. The contractor must maintain a qualified on-site operations team, provide real-time data logging, and submit monthly performance reports. All work is to be performed at the Port Authority’s fuel infrastructure facilities on the JFK Airport campus.
Contact
Agency contact for this bidName, email & phone — included with ProProMore from this agency
Similar open bids
- Replacement of the Cyclone Degritters and Grit Washers at the Bowery Bay Wastewater Treatment Plant — Environmental Protection
- 2027 Sewer System Maintenance Project — Rockland County Sewer District No. 1
- 2026 Penfield Little League Building Sanitary Sewer Upgrades — Town of Penfield, NY
- Erie County Sewer District No. 1 French Road at Randy Way Sanitary Sewer Replacement — Erie County
- Operation and Maintenance of Bulk and Satellite Fuel Farm Wastewater Treatment Facilities at John F. Kennedy… — The Port Authority of New York and New Jersey
Closing this week nearby
- Adirondack Planning Forum 2027 — closes Oct 26, 2026
- Hazardous Tree Removal Along Lake Ontario State Parkway — closes Oct 26, 2026
- PMC Services for Brooklyn Bridge - City Hall (Vents and Mezzanine) — closes Oct 26, 2026
- Long Island South Shore Estuary Reserve Grant Program RFA — closes Oct 26, 2026
- Downstate Semiconductor Chip Design Center — closes Oct 26, 2026