Commercial Kitchen Equipment Procurement, Drawings, and Installation
Allen County School DistrictScottsville, Kentucky
The work includes full equipment specification, delivery, installation, start-up, training, and closeout. The Owner will provide electrical and gas hookups to within 5 feet; the contractor supplies final connections. Bids must be submitted by December 4, 2026, at 1:00 PM Central Time via email or mail. The contract is expected to be awarded within 15 business days of the due date.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 4, 2026
- Submission
- email, mail, hand delivery
- Documents analyzed
- 1
- Required submission items
- 2 items · full checklist with Pro
Scope of work
- Procure and install one (1) 2-sided forced-air milk cooler
- Comply with NSF/ANSI, UL/ETL, NEC/NFPA, and Kentucky codes
Steps to Bid
- 1
Submit any questions to Robin Herrington, Food Service Director, via email at [email available with Pro] by December 4, 2026, at 1:00 PM Central Time.
- 2
Prepare and complete the bid form (Section 10), including lump sum pricing, warranty, and acknowledgements.
- 3
Submit the complete proposal via email to [email available with Pro] (subject: ACBOE Kitchen Equipment RFP – [Bidder Name]) or by mail/hand delivery to Robin Herrington, FSD, Allen County Board of Education, 570 Oliver St., Scottsville, KY 42164.
- 4
Confirm receipt of submission with the Food Service Director.
What you'll need
Submission
Email, Mail, Hand delivery
NAICS
339999, 541611
How to submit
Submit via email to [email available with Pro] with subject line: 'ACBOE Kitchen Equipment RFP – [Bidder Name]'. Or mail/hand deliver to the address above. Bidders are responsible for verifying receipt.
In person/mail: Robin Herrington, FSD, Allen County Board of Education, 570 Oliver St., Scottsville, KY 42164
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
- The 2-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Milk cooler must have dual access (front/back), 12 crate capacity, and external digital thermometer. Turn-key delivery, installation, start-up, training, and closeout required. Owner provides electrical/gas hookups to within 5 feet or per manufacturer requirement; contractor supplies final whips, flex, quick-disconnects, gas hose kits with restraining devices, drains, and condensate piping. Bid must include all accessories, delivery, placement, assembly, anchoring, final connections, start-up, training, and cleanup. Training: minimum 2 hours per equipment type and operator quick-reference guides. Closeout: O&M manuals, warranties, as-built utility locations, spare parts lists, and consumables. Bidders must verify site access, dimensions, and utility locations pre-order. Work hours to be coordinated with school operations; after-hours/weekend work may be required. Bid valid for 60 days. All substitutions must be supported by cut sheets demonstrating equal or superior performance. Bidders responsible for verifying receipt of submission.
Key dates
- Questions due
- Dec 4, 2026, 1:00 PM Eastern Time
- Bids due
- Dec 4, 2026
- Expected award
- Jan 10, 2027
Documents
- Oven_Milk-Cooker-RFP.pdf7 pages
Similar bids near Scottsville
- Warren County Regional Jail - Food Service & Commissary · Bowling Green · closes Dec 4, 2026
Closing soon near Scottsville
- Marketing Services for Warren County Public Schools — 2027-2029 School Years · Bowling Green · closes Dec 1, 2026
- Charter Bus Services for WKU Softball Team Travel · Bowling Green · closes Dec 4, 2026