OpenRFPCloses Dec 14, 2026

Snowplowing and Ice Control Services for Palenville Firehouse — 2026–2027 Winter Season

PLOWING & ICE CONTROL SERVICES Palenville Fire DistrictPalenville, Columbia, New York

Work includes clearing apparatus bays, exit ramps, parking areas, walkways, and emergency exits. Plowing must begin at 2 inches of snow or during freezing conditions. All areas must remain passable during storms. De-icing with District-approved materials must follow each plow. Snow must be placed only in designated areas. The contractor must respond within 1 hour of trigger or emergency call, 24/7/365. Damage caused by operations is the contractor’s responsibility.

On PublicBidSearch: the newspaper notice, 1 bid document and the agency contact (email) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidEmail — included with ProPro

Overview

Due
Dec 14, 2026
Time stated in bid documents
Dec 14, 2026, 5:00 PM Eastern Time
Submission
mail, email
Contract term
12/16/2026 to 04/15/2027 + Option to renew for additional season(s)
Documents analyzed
1

Scope of work

  • Clear apparatus bay aprons and exit ramps to Route 32A
  • Shovel and treat walkways, entrances, and emergency exits
  • Apply District-approved ice-melt after each plow
  • Push snow only to designated storage areas

Steps to Bid

  1. 1

    Review the full solicitation and scope of work.

  2. 2

    Submit the proposal via mail to P.O. Box 100, Palenville, NY 12463, or email to [email available with Pro]. by Dec 14, 2026, 5:00 PM

What you'll need

Submission

Mail, Email

NAICS

238290, 488490

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The scope includes clearing apparatus bay aprons, front and rear exit ramps onto Route 32A, firefighter parking areas, perimeter access paths, pedestrian walkways, entrance doors, and emergency exits. Snow removal must begin at 2 inches of accumulation or upon request during freezing rain, sleet, or drifting. De-icing must be applied with District-approved salt/sand or ice-melt products after each plow to prevent refreezing. Snow must be pushed only to designated storage areas, avoiding utility meters, propane and fuel tanks, and Route 32A sightlines. The contractor is liable for any damage to pavement, curbing, structures, or landscaping caused by operations. Box 100, Palenville, NY 12463, or email to [email available with Pro].

Key dates

Bids due
Dec 14, 2026

Documents

  • f9d2.7e5752d0e0771.e93fe5fa2-d18e.0e5e5bccc-de91.1c10dd207-ce4d.fd82a5d0e-fb.pdf1 pages

See all documents · Download with Pro

Similar bids near Palenville

Closing soon near Palenville