Parking Lot E8 Repairs
California State University, Long BeachLong Beach, California#CSULBSOQ80
The California State University, Long Beach, is soliciting sealed bids for the repair and reconstruction of Parking Lot E8, including full removal of existing 4-inch asphalt and 18 inches of soil (including 12–14 inches of cement-treated soil), replacement with 4 inches of asphalt over non-expansive fill compacted to 95% relative compaction, and installation of one new EV charging station and conversion of nine EV-ready stalls to full EV charging. A mandatory pre-bid site walk is scheduled for November 16, 2026, at 11:00 a.m. at the North end of the lot. The bid must be submitted by 2:00 p.m. on December 16, 2026, at the Design and Construction Services Office, 1331 Palo Verde Avenue, Long Beach, CA 90840. The estimated value is $3,700,000.
On PublicBidSearch: the original bid posting and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 16, 2026
- Time stated in bid documents
- Dec 16, 2026, 2:00 PM Pacific Time
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Required submission items
- 3 items · full checklist with Pro
Steps to Bid
- 1
Attend the mandatory pre-bid site walk on November 16, 2026, at 11:00 a.m. at the North end of Parking Lot E8 was Nov 16, 2026, 11:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 2
Submit all required bid documents, including completed bid package and bid bond, by 2:00 p.m. on December 16, 2026 by Dec 16, 2026, 2:00 PM
What you'll need
Contract duration
April 1 – July 30, 2027
Submission
Mail, Hand delivery
NAICS
237130, 237199
How to submit
Proposals must be submitted in sealed envelopes, clearly marked with the bid number and project name. All required forms and documents must be completed and included. Delivery at least one day prior to the due date is highly recommended.
In person/mail: 1331 Palo Verde Avenue, Long Beach, CA 90840
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Proposals will be received in the above-mentioned office until 2:00 p.m. on Wednesday, December 16, 2026, in accordance with the contract documents, at which time the proposals will be publicly opened and read. The project shall be in accordance with the plans and specifications prepared by 19six Architects; 802 East Cota Street, Suite A, Santa Barbara; Ewa Pocwiardowska; (805) 963-1955, email: [email available with Pro]. The Owner’s construction estimate is $3,700,000. Scope: In general, the work consists of the complete removal of the existing 4-inch asphalt pavement and the upper 18 inches of soil (which includes 12–14 inches of cement-treated soil). The new asphalt section will consist of a minimum of 4 inches of asphalt placed over non-expansive fill compacted to a minimum of 95% relative compaction. All items in the bid package must be completed and submitted for bids to qualify. The Trustees require the successful bidder to achieve three percent (3%) DVBE participation in contracting construction projects as established in the bidding documents, and bidders shall identify the DVBEs to be used to satisfy this requirement in their bids. Contact Tammy Dinh with any questions. Email: [email available with Pro]; Phone: (562) 985-1846.
Key dates
- Pre-bid meeting
- Nov 16, 2026, 11:00 AM Pacific Time
- Site visit
- Nov 16, 2026, 11:00 AM Pacific Time
- Bids due
- Dec 16, 2026
- Expected award
- Dec 18, 2026
Similar bids near Long Beach
- On-Call Asphalt Pothole Repair and Pavement Maintenance Services · Norwalk · closes Dec 15, 2026
- City Hall and Public Works Yard Accessibility Improvements Project · Maywood · closes Dec 4, 2026
- Residential Street Resurfacing · Cypress · closes Dec 4, 2026
- Stadium Gateway Parking Lot Slurry Seal Services · Anaheim · closes Dec 18, 2026
- Railroad Street Improvements from Azusa Avenue to Fullerton Road · Industry · closes Dec 3, 2026
Closing soon near Long Beach
- As-Needed Plumbing Services · Long Beach · closes Dec 1, 2026
- R-7292 Marine Stadium Electrical Infrastructure · Long Beach · closes Dec 2, 2026
- R-7298 1st Street Pedestrian Improvements · Long Beach · closes Dec 3, 2026
- OCADY's Training Prop Repair and Maintenance · Long Beach · closes Dec 4, 2026
- Preventative Maintenance, Inspection, and Repair Services for Government-Owned Fume Hoods and Safety Cabinets · Long Beach · closes Dec 4, 2026