Paving Services for the Boyd Ave Greenway Connector
Town of WaynesvilleWaynesville, North Carolina
The Town has completed rough clearing and demolition. The contractor is responsible for all materials, labor, equipment, compaction, and site cleanup. The Town will handle bollard installation, driveway work, crosswalks, and light pole installation. Proposals must be submitted by December 4, 2026, at 4:00 PM, both physically and via email. The Town reserves the right to cancel or amend the RFP.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 4, 2026, 4:00 PM Eastern Time
- Submission
- mail, email
- Documents analyzed
- 1
Scope of work
- Install 8-inch aggregate subbase on 75% of the 1,000-foot greenway trail
- Install 22-inch aggregate subbase on 25% of the trail
- Pave with 2-inch asphalt overlay
- Perform fine grading and slope adjustments for water runoff
- Complete all site finishing, including final adjustments and debris cleanup
Steps to Bid
- 1
Review the RFP and attached engineering plans and specifications
- 2
Deliver sealed physical copies to Alex Mumby, Development Services, 9 S. Main St, Suite 110, Waynesville, NC 28786 by Dec 4, 2026, 4:00 PM
- 3
Email a digital copy to [email available with Pro] with subject line: 'RFP: Boyd Ave Greenway Connector' by Dec 4, 2026, 4:00 PM
- 4
Submit questions by December 1, 2026, to [email available with Pro] by Dec 1, 2026, 11:59 PM
What you'll need
Submission
Mail, Email
NAICS
237130, 237199
How to submit
Proposals must be sealed, physically delivered, and emailed. Include 'RFP: Boyd Ave Greenway Connector' in the subject line. All submissions must be received by 4:00 PM on December 4, 2026.
In person/mail: 9 S. Main St, Suite 110, Waynesville, NC 28786
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project is 10 feet wide, narrowing to 8 feet in certain sections. The Town has completed rough clearing, excavation, and vegetation removal, including bamboo and tree removal, and has demolished existing structures. The Town will handle bollard installation, concrete driveway work along Boyd Avenue, and crosswalk installation on Killian Street. The Town will also install light poles (9 units), but not at this stage. The Town has received a $127,000 grant from the Haywood County Tourism Development Authority to fund the paving. Proposals must include total cost for labor, materials, equipment, compaction, and all other costs to complete the work. Submissions must be sealed and delivered physically and digitally via email to Alex Mumby at [email available with Pro]. The Town will not accept proposals submitted after the deadline. The contractor is responsible for all safety, debris control, site cleanup, and compliance with OSHA, NC Building Code, and federal/state regulations.
Key dates
- Questions due
- Dec 1, 2026, 11:59 PM Eastern Time
- Bids due
- Dec 4, 2026
- Expected award
- Dec 18, 2026
Documents
- Boyd_Ave_Connector_RFP_2nd_Bid.pdf23 pages
Similar bids near Waynesville
- Request for Letters of Interest - Cragmont Road Repair CEI · Black Mountain · closes Dec 4, 2026
Closing soon near Waynesville
- FY27 Utility Cut Concrete Repair · Asheville · closes Dec 2, 2026
- Property Fencing Repair · Asheville · closes Dec 2, 2026
- Police Vehicle Graphic Replacement · Asheville · closes Dec 3, 2026
- Medical Waste Removal and Recycling Services · Asheville · closes Dec 4, 2026
- Refrigerated Beer Tap Trailer · Asheville · closes Dec 4, 2026