PCB-Contaminated Equipment Assessment Services for San Carlos Irrigation Project
Bureau of Indian Affairs — WESTERN REGIONCoolidge, Arizona#140A1127Q0091
The Bureau of Indian Affairs (BIA) is seeking quotes for PCB-contaminated equipment assessment services at the San Carlos Irrigation Project (SCIP) Maintenance Yard and Saguaro Substation in Arizona. The work includes testing 100 unlabeled transformers at the Maintenance Yard for PCB content, indoor air sampling and analysis in the laboratory building, 55 wipe tests on interior surfaces, and testing three inactive transformers at the Saguaro Substation. The contractor must prepare draft and final reports for both sites. The selected contractor must have at least three years of experience in bulk transformer testing for PCB content at two or more facilities, indoor air sampling and analysis for VOCs, SVOCs, PCBs, or pesticides using EPA-approved methodology, and PCB-wipe testing at two or more facilities. The quote must be submitted via email to Melanie Schiaveto by 5:00 PM Mountain Time, November 30, 2026. The contractor must provide OSHA Level C PPE with organic vapor and P100 cartridges for all tasks in the laboratory building. The contractor is responsible for all waste disposal, including PCB-contaminated waste. The performance period is 90 days from award.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 9, 2026
- Submission
- Documents analyzed
- 4
Steps to Bid
- 1
Register in SAM and ensure entity is active and compliant.
- 2
Review the full solicitation document, including the Statement of Work (SOW), attachments, and all clauses.
- 3
Submit questions to the Contracting Officer via email to [email available with Pro] by 5:00 PM Mountain Time, November 30, 2026. by Nov 30, 2026, 5:00 PM
- 4
Prepare and submit a quote via email to [email available with Pro] with the subject line: 'Company Name Quote in Response to 140A1127Q0091'. by Nov 30, 2026, 5:00 PM
- 5
Ensure the quote includes: Unique Entity ID, complete business mailing address, contact name, phone number, email address, RFQ number, quote number, quote date, pricing in Firm Fixed-Price (FFP) format, two project descriptions (not to exceed one page each) of experience completing each of the three
What you'll need
Contract duration
90 days from award date
Submission
NAICS
541620
How to submit
Submit quote via email to [email available with Pro] with the subject line: 'Company Name Quote in Response to 140A1127Q0091'. The quote must include: Unique Entity ID, complete business mailing address, contact name, phone number, email address, RFQ number, quote number, quote date, pricing in Firm Fixed-Price (FFP) format, two project descriptions (not to exceed one page each) of experience completing each of the three tasks listed in the SOW, and resumes, certifications, and accreditations of field staff. The quote must be received on or before 5:00 PM Mountain Time, November 30, 2026. If confirmation of receipt is not received within 24 hours, the submitter must contact the designated recipient directly to confirm receipt.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 9 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The Bureau of Indian Affairs (BIA) Western Region Division of Environmental, Safety, and Cultural Resources Management (DESCRM) is soliciting quotes for PCB-contaminated equipment assessment services at the San Carlos Irrigation Project (SCIP) Maintenance Yard and Saguaro Substation in Pinal County, Arizona. The scope includes: (1) testing oil from 100 unlabeled transformers at the SCIP Maintenance Yard (13805 N. Arizona Blvd, Coolidge, AZ) for PCB content using EPA-approved methodology; (2) conducting indoor air sampling and analysis for VOCs, SVOCs, PCBs, and petroleum hydrocarbons in the laboratory building at the Yard; (3) performing 55 wipe tests on interior surfaces (walls, floors, ceilings, and contents) of the laboratory building; (4) testing oil from three inactive 667 KVA transformers at the Saguaro Substation (approx. 1 mile north of Kearny, AZ) for PCB content; and (5) preparing draft and final reports for both sites. The contractor must submit a Project Work Plan within 21 calendar days of notice to proceed. All work must be completed within 90 days of award. No tribal permits are required. The contractor must comply with all applicable federal and state regulations, including OSHA, USEPA, and ADEQ. The contractor is not required to perform an Arc Flash Hazard Analysis at the Yard, but must address arc flash hazards at the Saguaro Substation in the Health and Safety Plan. The contractor is responsible for moving transformers if necessary for sampling. The contractor must provide and remove all equipment used for the project, except for containment bags and bins provided by SCIP. The contractor must submit a signed and completed IEE Representation Form (DIAR 1452.280-4) with the quote. The quote must be submitted via email to Melanie Schiaveto at [email available with Pro] with the subject line: 'Company Name Quote in Response to 140A1127Q0091'. The quote must include: Unique Entity ID, complete business mailing address, contact name, phone number, email address, RFQ number, quote number, quote date, pricing in Firm Fixed-Price (FFP) format, two project descriptions (not to exceed one page each) of experience completing each of the three tasks listed in the SOW, and resumes, certifications, and accreditations of field staff. The contractor must notify the Contracting Officer in writing if it encounters difficulty in performance. The contractor must use the U.S. Department of the Treasury's Invoice Processing Platform (IPP) to submit payment requests. The final invoice must be submitted within 60 calendar days of product acceptance or completion of services. The contractor must provide a certificate of completion and release of claims against the government for any further payment under this award.
Key dates
- Questions due
- Nov 30, 2026, 5:00 PM Arizona Time
- Bids due
- Dec 9, 2026
Documents
- Sol_140A1127Q0091.pdf20 pages
- Bid_Sheet_-_PCB_Assessment_SCIP.xlsx
- IA_-_IEE_Representation_Form.pdf1 pages
- SCIP_PCB_Assessment_SOW_10_14_2026_rev_11_4_2026.pdf11 pages
More from this agency
- Y--Cove Day School Construction · closes Jan 6, 2027
Similar bids near Coolidge
- Request for Proposals — Town of Gilbert · Gilbert · closes Dec 2, 2026
- Boggs Substation Switchgear (Buy America Preference) · Tempe · closes Dec 23, 2026
Closing soon near Coolidge
- Request for Qualifications — City of Casa Grande · Casa Grande · closes Dec 1, 2026
- Eloy Municipal Airport Drainage Improvements · Eloy · closes Dec 1, 2026
- Airport Drainage Improvements Phase 3 · Eloy · closes Dec 1, 2026
- On-Call Airport Engineering and Construction Mgmt · Casa Grande · closes Dec 1, 2026
- On-Call Professional Services - Transportation and General Civil Design Services · Queen Creek · closes Dec 3, 2026