OpenIFBCloses Dec 1, 2026, 10:00 AM CT

Milling, HMA Patching and Surfacing, Route 1055 — Douglas County Project 2027-06 (RFB-2026-0014)

Douglas CountyKansas#RFB-2026-0014

Douglas County is soliciting sealed bids for milling, HMA patching, and surfacing on Route 1055 and alternate routes. The work includes milling, HMA-Commercial Grade Patching, 2” HMA-Surfacing, aggregate shouldering, monument boxes, and traffic control. The project is located on Route 1055 (N720 to N930), with alternate routes on Route 458. The work must be completed in 25 working days, with 10 additional days if either Add-Alternate is accepted. Bids must be submitted electronically via the county’s purchasing portal by 10:00 A.M. on December 1, 2026. A bid bond of at least 5% of the base bid is required. The contract will be awarded within 30 days of bid opening. The successful bidder must enter into a contract and provide a performance bond.

On PublicBidSearch: the newspaper notice, 2 bid documents and the agency contact (name only) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Dec 1, 2026, 10:00 AM CT
Time stated in bid documents
Dec 1, 2026, 10:00 AM Central Time
Bid bond
5%
Submission
electronic portal
Documents analyzed
2
Required submission items
2 items · full checklist with Pro

Scope of work

  • Traffic Control during construction
  • Add-Alternate 1: Route 458 (E1400 to E1500)
  • Add-Alternate 2: Route 458 (E1290 to E1400, excluding 16 ft shoulders)

Steps to Bid

  1. 1

    Register as a vendor on the Douglas County purchasing portal at Official linkPro

  2. 2

    Review the full solicitation and all attachments, including Add-Alternate options

  3. 3

    Submit the bid electronically through the county’s purchasing software by 10:00 A.M. on December 1, 2026 by Dec 1, 2026, 10:00 AM

  4. 4

    Ensure the bid is signed electronically by a duly authorized representative by Dec 1, 2026, 10:00 AM

  5. 5

    Deposit a certified check, cashier’s check, or bid bond for not less than 5% of the base bid amount, payable to the Douglas County treasurer by Dec 1, 2026, 10:00 AM

What you'll need

Contract duration

25 working days from Notice to Proceed, with 10 additional days if either Add-Alternate is accepted

Submission

Electronic portal

NAICS

237130

How to submit

Bids must be submitted electronically through the county’s purchasing software at Official linkPro. The bid must be signed electronically by a duly authorized representative. No other method of submission will be accepted. Late submissions will not be permitted.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 2-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Douglas County Project 2027-06 involves milling, HMA-Commercial Grade Patching, 2” HMA-Surfacing, Aggregate Shouldering, Monument Boxes, and Traffic Control on Route 1055 (N720 to N930 Roads, with 542 ft of 1600 RD and approaches at N790 and N800). Two Add-Alternate bids are included: one for Route 458 (E1400 Road to E1500 Road), and another for Route 458 (E1290 to E1400 Road except 16 ft shoulders, for 1,461 ft will not receive the mill and overlay). The anticipated 'Notice to Proceed' is May 17, 2027. The late 'Notice to Proceed' is June 7, 2027. Bids must be submitted electronically through the county’s purchasing software at [link available with Pro]. A bid must be signed electronically by a duly authorized representative. Late submissions will not be accepted. Each bidder must deposit a certified check, cashier’s check, or bid bond for not less than 5% of the base bid amount, payable to the Douglas County treasurer.

Key dates

Bids due
Dec 1, 2026, 10:00 AM CT

Documents

  • 32426-2026-11-10_1005.txt
  • 32426-2026-11-21_1003.txt

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby