Planned Maintenace RFP - SBC
Southern Boone County R-I School DistrictAshland, Missouri
Work includes spring and fall inspections of RTUs, MUA, NAU, DOAS units at Primary, Elementary, Middle, High, and Ranken schools. Fluid cooler maintenance is required at Primary and High Schools. Bidders must submit a completed Bid Proposal (Exhibit A) and E-Verify Affidavit (Exhibit B) in sealed envelopes to the Central Office at 5275 West Red Tail Dr, Ashland, MO 65010. Questions must be submitted by December 8, 2026. The District will pay invoices monthly. Contractors must comply with Missouri labor wage standards.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 10, 2026, 11:59 PM CT
- Submission
- mail, hand delivery
- Contract term
- January 1, 2027, to December 31, 2027
- Documents analyzed
- 1
Scope of work
- Monthly invoicing for services rendered
- E-Verify compliance for all employees
Steps to Bid
- 1
Review the full RFP document, including all exhibits and site pictures.
- 2
Submit all questions to Kristen Colbert ([email available with Pro]) or Tabitha Shutt ([email available with Pro]) by December 8, 2026. by Dec 8, 2026, 11:59 PM
- 3
Prepare and complete the Bid Proposal (Exhibit A) and E-Verify Affidavit (Exhibit B).
- 4
Submit the completed bid in a sealed envelope to the Central Office at 5275 West Red Tail Dr, Ashland, MO 65010.
What you'll need
Submission
Mail, Hand delivery
NAICS
238290
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 9 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Work locations include 803 & 809 S. Henry Clay Blvd, 305 N. Main St., 14520 S. Crump Ln., and 975 Perry Ave., all in Ashland, MO. Spring inspections cover refrigerant and oil levels, electrical components, motor amp draw, visual leak checks, evaporator coil inspection, pressure logging, condenser coil washing, air filter replacement, and deficiency reporting. Fall inspections include heat operation, heat exchanger checks, safety verification, motor amp draw, filter replacement, condenser washing, and deficiency reporting. Fluid cooler maintenance at Primary and High Schools includes spring and fall tasks: cleaning sump basins, spraying tower fill, greasing bearings, replacing belts, filling and starting systems, bleeding air, checking basin heaters, monitoring pump/motor amp draw, cleaning nozzles, and lubricating motors/pumps. Bid opening is scheduled for December 10, 2026, at 1:00 pm local time. Questions must be submitted by December 8, 2026, to Kristen Colbert ([email available with Pro]) or Tabitha Shutt ([email available with Pro]). The District will pay invoices monthly, sent on the first of each month. Contractors must comply with Missouri Division of Labor Standards, Boone County Annual Wage Order No. 33, Section 010.
Key dates
- Pre-bid meeting
- Dec 2, 2026, 11:00 AM Central Time
- Bids due
- Dec 10, 2026, 11:59 PM CT
Documents
- Planned-Maintenace-RFP---SBC-.docx.pdf15 pages
Similar open bids
- Replacement of HVAC Unit at Public Works FY27 — City of Lebanon
- North Pointe Aquatic Center Capital Improvement and Modernization — City of Ballwin
- 00 1113 - Invitation to Bid - Kville HVAC '27.doc — Kirksville R-III School District
- Install New HVAC — Missouri Office of Administration - Division of Facilities…
- HVAC Preventative Maintenance, Repair, and Emergency Services — Housing Authority of Kansas City
Closing this week nearby
- Alton R-Iv School District: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 18, 2026
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- Guard Wheel Power Truck Shade Window Right Side (Core Return) — OEM Only, Per Bi-State Specifications — closes Nov 19, 2026
- ISD Santa Fe Trails Elementary School Roof Improvements — closes Nov 19, 2026
- New Ballas Sidewalk Project – Phase 3 — closes Nov 19, 2026