OpenRFPCloses Dec 21, 2026

Repair and Overhaul of Power Supply Assembly (NSN: 6130-01-709-1290, P/N: 8555271-1)

Dept of the Navy — NAVSUP WEAPON SYSTEMS SUPPORTPennsylvania#N0038327RAA31

The Navy is soliciting bids for the repair and overhaul of a Power Supply Assembly (NSN: 6130-01-709-1290, P/N: 8555271-1) to Ready for Issue (RFI) condition. Work must be performed at the contractor’s facility using BAE Systems drawing 80249, revision latest. The contractor is responsible for all tooling, test equipment, and manufacturing aids. Repair turnaround time (RTAT) must be met as defined by physical receipt in the CAV system. A throughput of X units per month is required. Induction of assets must occur within 365 days of contract award. The contractor must obtain DCMA approval for any item deemed Beyond Economical Repair (BER). All repair procedures and test documentation must be approved by the Government prior to execution. No Government-provided repair equipment or tooling is available.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 21, 2026
Time stated in bid documents
Dec 21, 2026, 1:00 PM Eastern Time
Submission
electronic portal

Steps to Bid

  1. 1

    Register on Official linkPro and ensure active status.

  2. 2

    Review the full solicitation on Official linkPro at the provided URL.

  3. 3

    Submit a bid response by the due date and time via the Official linkPro portal. by Dec 21, 2026, 1:00 PM

What you'll need

Submission

Electronic portal

NAICS

335931

How to submit

Submit via the Official linkPro portal. Responses must be submitted electronically through the official Official linkPro solicitation page.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Work must be performed in accordance with BAE Systems Information and Electronic Systems Integration drawing 80249, revision latest, and all referenced specifications. The contractor is responsible for providing all fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, and other manufacturing aids required for repair, testing, and inspection. Repair turnaround time (RTAT) must be met as defined: the contractual delivery requirement begins upon physical receipt of the asset at the contractor’s facility, as recorded in the Cognizant Asset Visibility (CAV) system. The contractor must report all transactions by the end of the fifth business day after receipt. Final inspection and acceptance must occur within the RTAT specified in the contract schedule. A throughput constraint of X units per month is required (contractor to fill in). Induction expiration date is 365 days after contract award; assets received after this date are not authorized for repair without bilateral agreement. The contractor must obtain written concurrence from DCMA for any item determined to be Beyond Economical Repair (BER), defined as repair cost exceeding 75% of the current production replacement price. The contractor is not entitled to equitable adjustment if the Government disapproves a change to repair manuals, drawings, specifications, or repair facility. All repair procedures and test/inspection documentation must be submitted for Government review and approval. The contractor must perform all work at the facility specified in the Statement of Work.

Key dates

Bids due
Dec 21, 2026

More from this agency

Similar bids in Pennsylvania

Closing soon in Pennsylvania