Repair and Overhaul of Power Supply Units

Dept of the Navy — NAVSUP WEAPON SYSTEMS SUPPORTPennsylvania#N0038327QAA37

The U.S. The contractor must perform all work at a designated facility and is responsible for providing all tools, test equipment, and manufacturing aids. The use of MIL-W-81381 wire is prohibited; SAE-AS22759 wire must be used instead. Repairs must be completed within the RTAT specified in the contract schedule. The contractor must report asset receipt in the CAV system within five business days. Induction of assets must occur within 365 days of contract award. The contract includes BER criteria: if repair costs exceed 75% of the current production replacement price, the item is not to be repaired. Mandatory use of Workflow Pro (WFP) Mod Assist Module is required.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 21, 2026
Time stated in bid documents
Dec 21, 2026, 3:30 PM Eastern Time
Submission
electronic portal

Scope of work

  • Repair and overhaul of power supply units to RFI condition
  • Repair Turnaround Time (RTAT) compliance required

Steps to Bid

  1. 1

    Register on Official linkPro and obtain a CAGE code if not already registered.

  2. 2

    Submit questions to the contracting officer by the deadline specified in the notice. by Dec 14, 2026, 3:30 PM

  3. 3

    Prepare and submit the bid response by the due date and time. by Dec 21, 2026, 3:30 PM

What you'll need

Submission

Electronic portal

NAICS

335931

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The items to be repaired include: Power Supply; NSN: 6130-01-537-2981; P/N: 105E7477G15. The contractor must perform all repairs at the facility identified in the Statement of Work. Repair work must comply with approved repair/overhaul manuals and technical drawings. The contractor must report asset receipt in the CAV system by the end of the fifth business day after physical receipt. Induction of assets must occur within 365 days of contract award; assets received after this date are not authorized for repair without bilateral agreement. Unapproved changes are at the contractor's risk, and the Government may reject items repaired using such changes. The contractor must ensure compliance with IPC/EIAJ-STD-001C for personnel performing repair tasks.

Key dates

Questions due
Dec 14, 2026, 3:30 PM Eastern Time
Bids due
Dec 21, 2026