Repair and Overhaul of Power Supply Units
Dept of the Navy — NAVSUP WEAPON SYSTEMS SUPPORTPennsylvania#N0038327QAA37
The U.S. The contractor must perform all work at a designated facility and is responsible for providing all tools, test equipment, and manufacturing aids. The use of MIL-W-81381 wire is prohibited; SAE-AS22759 wire must be used instead. Repairs must be completed within the RTAT specified in the contract schedule. The contractor must report asset receipt in the CAV system within five business days. Induction of assets must occur within 365 days of contract award. The contract includes BER criteria: if repair costs exceed 75% of the current production replacement price, the item is not to be repaired. Mandatory use of Workflow Pro (WFP) Mod Assist Module is required.
On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 21, 2026
- Time stated in bid documents
- Dec 21, 2026, 3:30 PM Eastern Time
- Submission
- electronic portal
Scope of work
- Repair and overhaul of power supply units to RFI condition
- Repair Turnaround Time (RTAT) compliance required
Steps to Bid
- 1
Register on Official linkPro and obtain a CAGE code if not already registered.
- 2
Submit questions to the contracting officer by the deadline specified in the notice. by Dec 14, 2026, 3:30 PM
- 3
Prepare and submit the bid response by the due date and time. by Dec 21, 2026, 3:30 PM
What you'll need
Submission
Electronic portal
NAICS
335931
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The items to be repaired include: Power Supply; NSN: 6130-01-537-2981; P/N: 105E7477G15. The contractor must perform all repairs at the facility identified in the Statement of Work. Repair work must comply with approved repair/overhaul manuals and technical drawings. The contractor must report asset receipt in the CAV system by the end of the fifth business day after physical receipt. Induction of assets must occur within 365 days of contract award; assets received after this date are not authorized for repair without bilateral agreement. Unapproved changes are at the contractor's risk, and the Government may reject items repaired using such changes. The contractor must ensure compliance with IPC/EIAJ-STD-001C for personnel performing repair tasks.
Key dates
- Questions due
- Dec 14, 2026, 3:30 PM Eastern Time
- Bids due
- Dec 21, 2026
More from this agency
- 61--SWITCH ASSEMBLY · closes Dec 21, 2026
- 48--VALVE,REGULATING,FL, IN REPAIR/MODIFICATION OF · closes Dec 21, 2026
- Repair of Naval Equipment Items Under Contract N0038327QAA38 · closes Dec 21, 2026
- Repair, Test, and Inspect Circuit Card Assemblies · closes Dec 21, 2026
- Control Panel Repair Services · closes Dec 21, 2026
Similar bids in Pennsylvania
- LI CBL FUSE PH A R - Procurement of Repair Part for Naval Weapon Systems Support · closes Dec 14, 2026
- Periscope Camouflage Cover Head Assembly #12 · closes Dec 23, 2026
- Repair of Amplifier Power Group · closes Dec 22, 2026
- Repair of LOWER HMI PANEL ASS · closes Dec 4, 2026
- Repair of RECEIVER-TRANSMITTE (CAGE Code 53711, Ref. No. 6625227) · closes Dec 23, 2026
Closing soon in Pennsylvania
- Procurement of Metal Plate, NSN 9535002322311 · closes Nov 30, 2026
- Cordless Snow Blower D2 FC · closes Dec 1, 2026
- Repair of Ceramic Ball Kit for Shipboard System · closes Dec 4, 2026
- Test Set, Surge Pro · closes Dec 4, 2026
- Procurement of Army Buckle Clips, E (NSN 8315016839267) · closes Dec 4, 2026