OpenSuppliesCloses Jan 4, 2027

Power Supply, NSN 6120-01-713-9042

Department of Defense — Defense Logistics AgencyNationwide (Federal)#SPE7M1-27-Q-0246

The Department of Defense is soliciting quotations for 3 units of power supply (NSN 6120-01-713-9042). Quotations must be submitted via the DIBBS portal. The Government may conduct Product Verification Testing at a Government lab; failure may result in rejection of the entire lot. The Government will arrange transportation under the First Destination Transportation (FDT) program. The contractor must comply with DLA technical and packaging standards. Mercury-containing compounds are prohibited unless used in specified applications.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Jan 4, 2027
Submission
electronic portal
Documents analyzed
1

Scope of work

  • Deliver FOB Origin within 144 days after award
  • Submit via DIBBS portal by 2027-01-04
  • Undergo Product Verification Testing if required

Steps to Bid

  1. 1

    Register on the DIBBS portal (Official linkPro) if not already registered.

  2. 2

    Review the full solicitation document (SPE7M1-27-Q-0246.PDF) and all incorporated provisions.

  3. 3

    Submit a quotation via the DIBBS portal by the due date and time. by Jan 4, 2027, 4:59 AM

What you'll need

Contract duration

144 calendar days from award

Submission

Electronic portal

NAICS

335311

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Acceptance and inspection will occur at destination. Pricing is firm fixed price. The Government may perform Product Verification Testing (PVT) at a Government-designated lab; if samples fail, the entire lot may be rejected. The contractor must ship samples with a copy of the system of record receiving report, DD Form 1222, and material certifications. The Government will return approved samples at no cost to the contractor. The contractor must not ship or deliver until PVT results are approved. The Government may deny approval of production facility changes even if all conditions are met.

Key dates

Bids due
Jan 4, 2027

Documents

  • SPE7M127Q0246.PDF7 pages

See all documents · Download with Pro

More from this agency

Similar bids nearby