Pre-Advertisement Notice for Green Infrastructure Maintenance & Installation Program
Atlanta, City OfAtlanta, Fulton, Georgia#PE-66062-NONST-2027-000000523
A Pre-Solicitation Conference will be held. Work will be performed on an on-call basis via Work Orders issued by the City. The contract is a unit price contract with no guaranteed minimum work volume. Quantities are approximations subject to change. Contractors must comply with City standards, including GDOT specifications, and all federal, state, and local laws. The City may assign work based on availability, response time, price, qualifications, past performance, and specialized capability. Unauthorized work will not be compensated. Contractors must submit cost estimates and schedules within two business days of Work Order issuance. Work must be completed within the agreed schedule and cost. Failure to meet deadlines may result in loss of future work assignments. Contractors must notify the City upon completion and provide before and after photos, service reports, and supporting documentation. The City may issue a punch list for deficiencies. Warranty period begins upon final acceptance and lasts for at least one year. Emergency response requires acknowledgment within one hour and mobilization within four hours unless otherwise specified. Contractors must maintain a 24-hour emergency contact. Site-specific work plans must be submitted and批准.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 9, 2026
- Time stated in bid documents
- Dec 9, 2026, 8:00 AM Eastern Time
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Contract term
- 3 years + two additional one-year renewal terms
- Documents analyzed
- 3
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Stabilize and restore streambanks to protect sewer infrastructure and water quality
- Perform on-call maintenance and repair work across multiple locations
- Comply with federal, state, and local environmental regulations
- Coordinate with public and private utilities and property owners
Steps to Bid
- 1
Attend the Pre-Solicitation Conference to receive details and ask questions.
- 2
If selected, submit a bid proposal including unit prices for all work items.
- 3
Wait for the City to issue a Work Order for specific work.
- 4
Upon receiving a Work Order, submit a cost estimate and schedule for approval.
- 5
Begin work only after receiving written authorization from the City.
- 6
Complete work and submit documentation for final acceptance.
What you'll need
Submission
Mail, Hand delivery
NAICS
238290
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
he City of Atlanta, on behalf of the Department of Watershed Management (DWM), will shortly undergo a Multi-Step Competitive Sealed Bidding process comprised of a qualification phase as the initial step, followed by an Invitation for Bid (IFB), for the procurement of qualified contractors to provide green infrastructure maintenance, installation, and streambank stabilization and restoration services throughout the City of Atlanta and applicable service areas. Interested and qualified vendors must demonstrate relevant experience performing green infrastructure, stormwater infrastructure, environmental restoration, landscape maintenance, installation, and/or streambank stabilization work of similar size, scope, and complexity. Vendors must demonstrate appropriate technical expertise, applicable licenses and certifications, qualified personnel, staffing capability, equipment, and field experience necessary to perform work in regulated and environmentally sensitive environments. Vendors must also demonstrate the operational capacity to perform on-call work across multiple locations while complying with applicable federal, state, and local requirements. The City reserves the right to make multiple awards to vendors determined to be responsible and responsive. A Pre-Solicitation Conference will be noticed and held to provide more details and address comments, questions, and concerns. Hope to see you there. Solicitation Type: Non-State Agency Agency: Atlanta, City Of Government Type: city Closing: Dec 09, 2026 @ 08:00 AM ET NIGP Codes: 91356 Construction, Utility and Underground Projects; 91345 Construction, Sewer and Storm Drain; 91223 Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.; 92641 Ecosystems Development, Management and Protection Services; 92558 Irrigation; Drainage; Flood Control Engineering
Key dates
- Bids due
- Dec 9, 2026
Documents
- 202611_supportingdocs_PE-66062-NONST-2027-000000523-2026-11-09_16_10_08-379.docx
- 202611_supportingdocs_PE-66062-NONST-2027-000000523-2026-11-09_16_10_13-45b.docx
- 202611_supportingdocs_PE-66062-NONST-2027-000000523-2026-11-09_16_24_09-f16.docx
More from this agency
- Screening Equipment Upgrade with AI-Assisted Threat Detection Integration — closes Nov 23, 2026
- RFP/DWM/2609-1270055/Architectural, Engineering, Design and Construction Phase Services — closes Nov 23, 2026
- Pre-Advertisement Notice for Drum Screen Equipment Parts and Ancillary Services — closes Nov 26, 2026
- Pre-Advertisement Notice for AFRD Vehicle & Equipment Repairs & Services — closes Nov 26, 2026
- Pre-Advertisement Notice for Fire and Rescue Tools and Equipment and SCBA Maintenance — closes Nov 27, 2026
Similar open bids
- Purchase of FLUROspeed x1 Conventional RF Elevating Table Radiographic/Fluoroscopy System for Ogeechee Technical College — State of Georgia Department of Administrative Services
- Construction Manager at Risk (CMAR) Preconstruction and Construction Services for Middle Oconee WRF 2027 Expansion — Jackson County Water And Sewerage Authority
- Repair of B-52 CONECT Components — DEPT OF THE AIR FORCE
- Gym/ Classroom Buildout — Baconton Community Charter School
- Request for Proposal - Fiber Internet Service for Charlton County Board of Education - 27CharltonInternet — Charlton County Schools
Closing this week nearby
- Power Supply Procurement - NSN 6120016274887 — closes Nov 20, 2026
- Differential Gear U, NSN 2520150266567, Quantity 4 — closes Nov 20, 2026
- 2027 CBDG Administration — closes Nov 20, 2026
- 2027 CDBG Engineering Services for Preliminary Design and Construction Administration — closes Nov 20, 2026
- Equipment for Two (2) Fire Engines, One (1) Tender, and Hoses — closes Nov 20, 2026