Request for Proposals for Progressive Design-Build Services: South Cobb Water Reclamation Facility Expansion
Cobb CountyMarietta, Cobb, Georgia#PE-77050-NONST-2027-000000112
Cobb County seeks a Design-Builder for the expansion of the South Cobb Water Reclamation Facility from 40 MGD to 50 MGD capacity using a progressive design-build method. The estimated budget is $300M–$400M. Proposers must be licensed in Georgia as a Utility or Commercial General Contractor, and the Engineer of Record must be a licensed Professional Engineer. The Design-Builder must have the capacity to secure 100% Performance and Payment bonds. The project includes two phases: Phase One (60% design, GMP, and preconstruction) and Phase Two (final design, construction, and commissioning). The County is considering two primary technology alternatives, with specific filter and membrane requirements. Access to adjacent Fulton County land is restricted by FAA regulations; the Design-Builder must obtain all necessary easements. A redacted Facility Plan is provided for informational use only. No questions will be accepted until the RFP is released in January 2027.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Feb 25, 2027
- Time stated in bid documents
- Feb 25, 2027, 12:00 PM Eastern Time
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Documents analyzed
- 2 published · 1 analyzed
- Required submission items
- 2 items · full checklist with Pro
Scope of work
- Develop 60% design and propose GMP in Phase One
- Evaluate and select technology pathway (A11.3 or A14.2) during Phase One
Steps to Bid
- 1
Monitor for the official RFP release on January 8, 2027 by Jan 8, 2027
What you'll need
Insurance
RequiredThe Design-Builder shall possess a valid Georgia Utility Contractor License and/or a Georgia Commercial General Contractor License. The designated Engineer of Record must be licensed as a Professional Engineer in the State of Georgia.
Submission
Electronic portal
NAICS
237130, 541330
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
- The 2-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Cobb County Water System (Owner) intends to select a Design-Builder to provide professional, construction, and commissioning services for the expansion of the South Cobb Water Reclamation Facility (WRF) from a current permitted capacity of 40 million gallons per day (MGD) maximum month flow (MMF) to 50 MGD MMF. The estimated budget is $300M–$400M, with the final Guaranteed Maximum Price (GMP) dependent on final process design and value engineering during Phase One. The project consists of two phases: Phase One includes site investigations, preliminary engineering, design development, preconstruction services, and preparation of a proposed price, schedule, and GMP based on 60% design completion. The Owner may convert the GMP to a lump sum for Phase Two, which includes final design, construction, and commissioning. The County anticipates using modified versions of DBIA Contract Documents 545 and 535. The Owner is considering two primary alternatives: Alternative A11.3 (4-Stage Bardenpho with Deep Bed Conventional Filters) and Alternative A14.2 (5-Stage Bardenpho with flat plate membranes). The Design-Builder will lead an Alternative Evaluation Phase during Phase One to finalize the technology pathway. Access to three Fulton County parcels is prohibited due to FAA flight zone restrictions. The Design-Builder must obtain subsurface approvals and easements from Fulton County and FAA to route utilities under the restricted land. No inquiries will be accepted until the official RFP is issued in January 2027.
Key dates
- Bids due
- Feb 25, 2027
Documents
- 202611_supportingdocs_PE-77050-NONST-2027-000000112-2026-11-03_08_24_49-87f5.pdf3 pages
- 202611_supportingdocs_PE-77050-NONST-2027-000000112-2026-11-03_08_24_53-feb0.pdf
More from this agency
- Addition of a New Traffic Signal, Right Turn Lanes, and Sidewalk at Canton Road at Lake Drive / Old Noonday School… — closes Dec 10, 2026
- B2755 / Bells Ferry Road / Roberts Boulevard / Vaughn Road Transit ADA Improvements — closes Dec 10, 2026
- Renovation of Customer Service Workstations at North Cobb Department of Driver Services (DDS) — closes Dec 11, 2026
- Construction of Pavilion and Restroom Facility at Terrell Mill Park — closes Dec 17, 2026
- Chattahoochee River Trail, Phase II – Design-Build Procurement — closes Jan 15, 2027
Similar open bids
- DSC J-472 DP, Utilities Upgrades Phase 1 RFQ-RFP — Regents, Board Of(University System Of Georgia)
- Professional Engineering Services Request for Qualifications — City of Jasper
- Design Services Hidden Creek Park — City of Dunwoody
- Repair of the TH-1H Servo Con Altimeter (NSN 6610014597535HL, Part No. 8047/10NVG-5V) — DEPT OF THE AIR FORCE
- New Student Union - Feasibility, Programming and Concept — University Of West Georgia
Closing this week nearby
- Power Supply Procurement - NSN 6120016274887 — closes Nov 20, 2026
- Differential Gear U, NSN 2520150266567, Quantity 4 — closes Nov 20, 2026
- 2027 CBDG Administration — closes Nov 20, 2026
- 2027 CDBG Engineering Services for Preliminary Design and Construction Administration — closes Nov 20, 2026
- Equipment for Two (2) Fire Engines, One (1) Tender, and Hoses — closes Nov 20, 2026