Prequalification - Elm Street Waterline Replacement-Woodstock
Msk EngineersBennington, Vermont#77277
Work includes trenching, removal of existing pavement, installation of ductile iron water main (minimum 360 ft), thrust blocks, valves, bridge substructure attachment, roadway base, pavement patch, and bridge substructure painting. Contractors must have three similar water main and three similar bridge projects in the last five years. Required submissions: EJCDC C-451 Qualifications Statement, UEI, and non-debarment certification.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Nov 23, 2026
- Time stated in bid documents
- Nov 23, 2026, 3:00 PM Eastern Time
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Documents analyzed
- 1
- Required submission items
- 5 items · full checklist with Pro
Scope of work
- Replace 360+ ft of ductile iron water main along Elm Street
- Trench and remove existing asphalt and subbase
- Sandblast, clean, and paint bridge substructure
Steps to Bid
- 1
Download and complete the EJCDC C-451 Qualifications Statement.
- 2
Gather proof of three (3) similar water main installations (ductile iron, ≥360 ft, last 5 years) and three (3) similar bridge projects.
- 3
Obtain a Unique Entity Identifier (UEI) from Official linkPro; contact Vermont APEX Accelerator if needed.
- 4
Prepare a written certification that the bidder and its principals are not debarred, suspended, or excluded from federal or Vermont procurement programs.
What you'll need
Insurance
RequiredFederal Wage Rates as determined under the Davis-Bacon Act.
Submission
Mail, Hand delivery
NAICS
237130, 237199
How to submit
Submit one original and one copy of the completed EJCDC C-451 Qualifications Statement, proof of project experience, UEI documentation, and non-debarment certification. All documents must be received by 3:00 PM on November 23, 2026. No electronic submissions accepted.
In person/mail: 31 The Green, Woodstock, VT 05091
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
- The 5-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The project is located in Woodstock, Vermont, with associated work at the bridge substructure in Windsor. Prospective bidders must submit a completed EJCDC C-451 Qualifications Statement, proof of three (3) similar water main installations in the last five (5) years, three (3) similar bridge work projects, a Unique Entity Identifier (UEI), and a written certification of non-debarment status.
Key dates
- Bids due
- Nov 23, 2026
Documents
- Ad_for_Prequalifications_Elm_St.pdf2 pages
More from this agency
- Barnet Fire District No. 2 Potable Water Supply PFAS Mitigation — closes Dec 3, 2026
Similar open bids
- Removal and Replacement of Bridge Structure and Components at Bridge No. 520 Over Harriman Brook on Washington County… — Agency of Transportation - Contract Administration
- Replacement of Bridge 15 Over Unnamed Tributary with Approach Roadway and Related Channel Work — Agency of Transportation - Contract Administration
Closing this week nearby
- FC0003-01 On Ramp Facilities Job Order Contract — closes Nov 20, 2026
- Fleet Fuel Services RFP for 2026-2027 Academic Year — closes Nov 23, 2026
- Request for Fleet Vehicle Fueling Proposals — closes Nov 23, 2026
- CG Station Burlington Replacement Water Heaters — closes Nov 23, 2026
- Roadside Hazardous Tree Removal Project – Town of Norwich, Vermont — closes Nov 23, 2026