ClosedIFBClosed Sep 3, 2026

Presidential Way at New Boston Street Intersection Reconstruction

City of WoburnWoburn, Massachusetts#IFB-27-04

The City of Woburn is seeking bids for the reconstruction of the Presidential Way at New Boston Street intersection. The project includes roadway improvements, sidewalks, curb ramps, and traffic signal conduit installation. Bids are due by September 3, 2026, at 12:00 PM NOON EST. A 5% bid bond is required.

On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Sep 3, 2026
Time stated in bid documents
Sep 3, 2026, 12:00 PM Eastern Time
Bid bond
5%
Payment bond
100%
Submission
mail, hand delivery
Documents analyzed
5 published · 1 analyzed
Required submission items
14 items · full checklist with Pro

Scope of work

  • Full depth pavement widening.
  • Add Alternative 1: Sidewalk on west side of New Boston Street.

Steps to Bid

  1. 1

    Submit sealed bids to the Purchasing Department, City of Woburn, 10 Common St. Woburn, MA 01801. was Sep 3, 2026, 12:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

    Bids must be sealed and marked with the solicitation title and number. An original of the response should be submitted. All forms listed in Section 1.1 must be included.

  2. 2

    Submit questions in writing to Orazio DeLuca, City of Woburn, Purchasing Department, 10 Common St. Woburn, MA 01801 or via email to [email available with Pro]. was Aug 20, 2026, 12:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Bid security

Required

5% Bid Bond of the total bid amount. 100% Payment Bond (Required for Awarded Contractor Only) provided within 10 days of award notice. Labor and Materials Bond from a surety company qualified to do business under the Laws of the Commonwealth of Massachusetts and satisfactory to the Awarding Authority in the amount stated.

Insurance

Required

Contractor shall maintain coverage for Workers’ Compensation, Comprehensive General Liability (including products, completed operations, and contractual liability), and Automobile Liability. Limits shall be no less than $1,000,000 in Bodily Injury and Property Damages for General Liability and Automobile Liability. A certificate of insurance naming the City of Woburn as Additional Named Insured must be filed prior to commencement of operations.

License

Contractor to be in business for at least five (5) years providing Concrete, installation and finish cement work, curbing.

Prequalification

Not required

Award method

Lowest firm fixed price (FFP)

Submission

Mail, Hand delivery

How to submit

All responses must be sealed and delivered to the Purchasing Department. Bid submitted must be an original. All bids must include the forms listed in Section 1.1. Response must be sealed and marked with the solicitation title and number.

In person/mail: City of Woburn / Purchasing Department, 10 Common Street, Woburn, MA 01801

Get alerts for bids like this

New concrete bids in Massachusetts

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

Work includes roadway improvements, installation of sidewalks and pedestrian curb ramps, and additional site improvements for a future traffic signal. Specific work includes full depth pavement widening, cement concrete pedestrian curb ramps, cement concrete sidewalk, granite curb, pavement markings, signage, and traffic conduit. All work must conform to the 2026 Standard Specifications for Highways and Bridges, Construction Standard Details, Standard Drawings for Signs and Supports, Standard Drawings for Traffic Signals and Highway Lighting, Manual on Uniform Traffic Control Devices (MUTCD) with Massachusetts Amendments, and other relevant standards and plans. Work hours are Monday through Friday, 7:00 AM to 3:30 PM, with restrictions on work during peak traffic periods.

Documents

  • IFB-27-04-Presidential-Way.pdf130 pages
  • IFB-27-04-Addendum-2.pdf7 pages
  • IFB-27-04-Addendum-1.pdf1 pages
  • Addendum-1-27-04-Re-Bid.pdf1 pages
  • Legal-Ad-IFB-27-04-re-bid.pdf1 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby