Professional Engineering Services for Lone Tree Road Feasibility Study, O'Leary Street to J.W. Powell Boulevard
City of Flagstaff — City Engineering - Capital ImprovementsFlagstaff, Arizona#2026-446
Powell Boulevard. The scope includes project management, monthly progress meetings, workshops, quality reviews, and technical memoranda on traffic, right-of-way, environment, and utilities. Deliverables include draft and final Feasibility Study reports with 15% concept plans, cost estimates, and all project data in electronic and CAD formats. The study aims to improve the corridor as a community gateway, enhance mobility, and reduce land-use friction. Firms must submit a Statement of Qualifications (SOQ). The bid deadline is 2026-11-12 at 12:00 PM local time in Flagstaff, Arizona.
On PublicBidSearch: the original bid posting for this bid.
Overview
- Due
- Nov 12, 2026
- Time stated in bid documents
- Nov 12, 2026, 12:00 PM Arizona Time
- Submission
- mail, hand delivery, email
- Required submission items
- 1 items · full checklist with Pro
Scope of work
- Conduct a Feasibility Study for Lone Tree Road from O’Leary Street to J.W. Powell Boulevard
- Host project workshops including Kickoff, public outreach, and comment resolution sessions
Steps to Bid
- 1
Review the solicitation and scope of services.
- 2
Prepare and submit a written Statement of Qualifications (SOQ) demonstrating relevant experience in project management, planning, and design of civil projects. was Nov 12, 2026, 12:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Ensure the SOQ is submitted by the due date and time. was Nov 12, 2026, 12:00 PM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Submission
Mail, Hand delivery, Email
NAICS
541330
How to submit
Submit a written Statement of Qualifications (SOQ) to the City of Flagstaff, City Engineering - Capital Improvements, via mail, hand delivery, or email. No specific submission portal is stated. The SOQ must be received by 12:00 PM on November 12, 2026, local time in Flagstaff, Arizona.
Get alerts for bids like this
New consulting bids in Arizona
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
The City of Flagstaff is seeking professional engineering services for a Feasibility Study of Lone Tree Road from O’Leary Street to John Wesley Powell Boulevard (JWP) in Flagstaff, Arizona. The study aims to enhance regional mobility, improve community and regional circulation, and minimize side friction between adjacent land uses and the corridor. Interested firms with demonstrated experience in project management and planning/design of civil projects are invited to submit a written Statement of Qualifications (SOQ) to present their qualifications. Scope of Services: TASK 100 – PROJECT MANAGEMENT & MEETINGS: 110 – Project Management: The firm shall develop a Project Management Plan, project progress reports, applicable formats and standards, coordinate with the Owner’s staff, and manage project team resources. 120 – Progress Meetings: The firm will conduct monthly progress meetings (by teleconference, video conference, or in person) with the Owner’s staff and contractor. The firm is responsible for developing agendas and discussion materials. Meeting minutes, including action items, must be submitted to the City Project Manager within ten (10) working days after each meeting. 130 – Project Workshops: The firm will conduct workshops including a Kickoff Workshop to discuss design objectives, process, work plan, and schedule; obtain as-builts and GIS data; Public Event preparation workshop; Draft Feasibility Study comment resolution meetings; and any other workshops as recommended. 140 – Quality Management: The firm shall conduct quality reviews of all deliverables by senior engineering or professional staff. 150 – Project Control and Reporting: Monthly invoices and project status reports (including services completed, schedule and budget status, issues, and change logs) will be submitted with invoices. 160 – Project Closeout: The firm will resolve final invoices, consolidate and archive project files, and meet with the Owner to review project performance and objectives. TASK 200 – EVALUATIONS AND TECHNICAL MEMORANDA: 200 – Construction Drawings (15%) and engineer’s itemized estimate of probable costs; 210 – Traffic analysis memo; 220 – Right-of-way impacts memo; 230 – Environmental analysis memo; 240 – Utilities memo; 250 – Draft Feasibility Study report including 15% concept plans, analysis documentation, and cost estimate; 260 – Final Feasibility Study report including summary of draft comments and final dispositions. TASK 300 – PROJECT CLOSE OUT: All deliverables must be provided electronically in Word, Excel, or PDF format. All CAD files developed for the project must be provided to the Owner. Final deliverables include: Final Feasibility Study (15% plans, cost estimate, analysis documentation in PDF), any spreadsheets and supporting data in editable format, and all CAD files.
More from this agency
- Purchase of New Aircraft Rescue Firefighting (ARFF) Class 1 Rapid Intervention Vehicle (RIV) for Flagstaff Airport · closes Dec 11, 2026
- Call to Artists - Artwork for a Traffic Signal Cabinet on the Fourth Street Corridor · closes Dec 15, 2026
- Sales Tax Auditor Services · closes Jan 7, 2027
- City of Flagstaff Public Housing Siler Site Scope of Work · closes Feb 2, 2027
Closing soon near Flagstaff
- Historic Preservation Commission Small Grant Funding Program · Cottonwood · closes Nov 30, 2026