OpenIFBCloses Dec 2, 2026

Installation of HD Shelving, Loading Dock Lift, Roof Replacement, and Signage at 201 Rivermoor Street, West Roxbury, MA

City of Boston — PFD01 - Public Facilities DepartmentBoston, Massachusetts#BD-27-1142-PFD01-PFD01-134988

Scope includes HD shelving installation in Space 146, a loading dock lift with supporting improvements, signage for wayfinding and code compliance, and partial roof replacement above Room 146 with demolition and integration into the existing system. Bids must be submitted by 12:00 PM on December 2, 2026, for filed sub-bids and by 12:00 PM on December 16, 2026, for general bids. A pre-bid meeting is mandatory on November 5, 2026, at 1:00 PM at the project site. Questions must be submitted by November 13, 2026, at 12:00 PM. A 5% bid bond is required. A 100% performance and payment bond is required. Prevailing wages apply. Electronic bids are accepted via the eBuilder portal.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 2, 2026
Time stated in bid documents
Dec 2, 2026, 12:00 PM Eastern Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery, electronic portal
Documents analyzed
1
Required submission items
4 items · full checklist with Pro

Scope of work

  • Install high-density (HD) shelving in Space 146
  • Provide and install a loading dock lift with supporting improvements
  • Install wayfinding and code-compliant signage
  • Complete all work in accordance with plans and specifications

Steps to Bid

  1. 1

    Attend the mandatory pre-bid meeting on November 5, 2026, at 1:00 PM at 201 Rivermoor Street, West Roxbury, MA 02132. was Nov 5, 2026, 1:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  2. 2

    Prepare and submit a sealed bid by 12:00 PM on December 2, 2026, for filed sub-bids, or by 12:00 PM on December 16, 2026, for general bids. by Dec 2, 2026, 12:00 PM

  3. 3

    Submit the bid via physical delivery to the PFD Bid Box at 26 Court St, Boston, MA 02108, or electronically via the eBuilder portal at Official linkPro. by Dec 2, 2026, 12:00 PM

What you'll need

Contract duration

250 calendar days from notice to proceed

Submission

Mail, Hand delivery, Electronic portal

NAICS

236220

How to submit

Bids must be sealed and submitted in a sealed envelope. Electronic submissions must be made via the eBuilder portal at Official linkPro. Physical bids must be delivered to the PFD Bid Box at 26 Court St, Boston, MA 02108.

In person/mail: 26 Court St, Boston, MA 02108

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 4-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

This includes provision and installation of a loading dock lift, associated structural and operational improvements, and installation of wayfinding and code-compliant signage. Work is detailed in the plans and specifications available electronically. A performance bond and payment bond in the amount of 100% of the contract price are required. Electronic bids are accepted via the eBuilder portal at [link available with Pro].

Key dates

Pre-bid meeting
Nov 5, 2026, 1:00 PM Eastern Time
Bids due
Dec 2, 2026

Documents

  • 7253_Rivermoor.Invitation_for_Bidder.Standard_Ad.rev.pdf2 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby