Larimer County is soliciting bids to replace Bridge No. LR63-4.7-44H over Little Beaver Creek with a new 30' x 8' x 50' three-sided box culvert and an 18' cattle guard. The scope includes removal of the existing timber structure, grading, erosion control, and channel restoration. Bidders must be experienced highway contractors with knowledge of CDOT bridge construction standards. The project is funded with federal dollars via a USFS 'Schedule A' agreement. A pre-bid meeting is scheduled for December 2, 2026, at 1:00 PM MT. Questions must be submitted by December 3, 2026, at 10:00 AM MT via BidNet. Bids must be submitted electronically via BidNet by December 9, 2026, at 2:00 PM MT. A 5% bid bond is required. The contract is non-renewable. The County may require a Statement of Qualifications from the apparent low bidder prior to award.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 10, 2026
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Contract term
- 120 calendar days from Notice to Proceed
- Documents analyzed
- 1
Steps to Bid
- 1
Register with BidNet
- 2
Review all bid documents, including attachments A–E, and the special provisions.
- 3
Attend the pre-bid meeting (virtual) on December 2, 2026, at 1:00 PM MT. by Dec 2, 2026, 1:00 PM
- 4
Submit all questions via BidNet by December 3, 2026, at 10:00 AM MT. by Dec 3, 2026, 10:00 AM
- 5
Prepare and submit the bid package via BidNet by December 9, 2026, at 2:00 PM MT.
What you'll need
Submission
Electronic portal
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Replacement of an existing timber bridge structure over Little Beaver Creek on County Road 63E (south of SH 14 and north of CR 44H) with a new 30' x 8' x 50' three-sided box culvert and a new 18' cattle guard. Work must be performed in accordance with the Colorado Department of Transportation’s Specifications for Road and Bridge Construction. The project is funded in part by federal dollars through a 'Schedule A' Agreement with the United States Forest Service.
Key dates
- Pre-bid meeting
- Dec 2, 2026, 1:00 PM Mountain Time
- Bids due
- Dec 10, 2026
Documents
- B26-10.pdf12 pages
More from this agency
- Final Settlement Notice – Bid No. B26-03, Project No. ENM000126 – 2026 Resurfacing Program · closes Dec 3, 2026
- Department's RFQs are posted at www.larimer.gov/drfq · closes Dec 31, 2026
- Groundwater Study · closes Jan 27, 2027
Closing soon near Fort Collins
- Grants Consultant for Public Health · Boulder · closes Nov 30, 2026
- Debt Collection Services · Fort Collins · closes Dec 2, 2026
- Coffman Street Extension (Boston Ave to 2nd Ave) · Longmont · closes Dec 2, 2026
- Pool Resurfacing Project · Berthoud · closes Dec 3, 2026
- Signal Upgrade and Intersection Improvements at US 287 & Main, US 287 & Chase, Broomfield County, Colorado · Broomfield · closes Dec 4, 2026