Pump, Fuel, Electrical (Mil-Spec) - NSN 2910-01-540-8057
Department of Defense — Defense Logistics AgencyNationwide (Federal)#SPE7L5-27-T-0834
The U.S. Department of Defense, through the Defense Logistics Agency (DLA), is soliciting quotes for 3 units of Mil-Spec PUMP, FUEL, ELECTRICAL (NSN 2910-01-540-8057). Offers must be submitted via the DLA Internet Bid Board System (DIBBS) at [link available with Pro]. The contractor must comply with ISO 9001:2015 or equivalent quality standards. A First Article Test (FAT) is required: one unit must be tested and the report submitted within 60 days of contract award. The contractor must notify the contracting officer at least 14 days prior to shipment. The item is subject to inspection and acceptance at origin. Delivery is FOB Origin. The contractor must not provide covered defense telecommunications equipment or services. The solicitation incorporates FAR, DFARS, and DLA clauses. The offeror must be registered in SAM and comply with all applicable regulations.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Nov 30, 2026
- Submission
- electronic portal
- Documents analyzed
- 1
Scope of work
- Do not use ozone-depleting chemicals
- Do not use additive manufacturing (AM) to produce the item
Steps to Bid
- 1
Review the full solicitation, including the DLA Master Solicitation for Automated Simplified Acquisitions Revision 106 and the DLA Technical and Quality Master List of Requirements.
- 2
Submit a quote via the DLA Internet Bid Board System (DIBBS) at Official linkPro. by Nov 30, 2026, 4:59 AM
- 3
Ensure the quote includes a price for the FAT line item (1 EA) and complies with all technical and quality requirements.
What you'll need
Submission
Electronic portal
NAICS
336310
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 8 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Item is subject to First Article Test (FAT) requirement per FAR 52.209-3. DLA Master List of Technical and Quality Requirements applies. First article units must be maintained by contractor until all production quantities are accepted. Solicitation issued under DLA Master Solicitation for Automated Simplified Acquisitions Revision 106 (Nov 3, 2026).
Key dates
- Questions due
- Nov 30, 2026, 4:59 AM
- Bids due
- Nov 30, 2026
Documents
- SPE7L527T0834.PDF24 pages
More from this agency
- Hose Assembly, Nonmetallic · closes Nov 30, 2026
- Impeller, Fan, Axial - NSN 4140-01-482-9735 · closes Nov 30, 2026
- Hose Assembly, Nonmetallic - NSN 4720-01-687-3883 · closes Nov 30, 2026
- Insulation, Vehicular (NSN: 2540-21-913-9478) · closes Nov 30, 2026
- BACKSHELL, ELECTRICAL CONNECTOR (NSN: 5935-01-448-9972) · closes Nov 30, 2026
Similar bids nearby
- STUD ASSEMBLY, TURNLOCK FASTENER · closes Dec 2, 2026
- Gasket, NSN 5330-01-714-4508 · closes Dec 7, 2026
- Security Data System (NSN: 7010-20-014-5018) · closes Dec 7, 2026
- Circuit Breaker Base, NSN 5925-01-221-8617 · closes Dec 1, 2026
- Plastic Sheet, Polytetrafluoroethylene, 24 in x 24 in x 0.5 in, NSN 9330-01-207-5523 · closes Dec 7, 2026
Closing soon nearby
- Resistor Assembly (NSN: 5905-01-290-8067) · closes Nov 30, 2026
- Thermal Pad Kit (NSN: 5999-01-533-7681) · closes Dec 1, 2026
- Rivet, Blind (NSN: 5320-01-232-5669) · closes Dec 2, 2026
- Case, ACLS Drug (NSN: 6515-01-477-6078) · closes Dec 2, 2026
- Hose Assembly, Nonmetallic (NSN: 4720-01-670-0754) · closes Dec 3, 2026