ClosedOther

Crescentville Road Signals and Pedestrian Improvements

City of Philadelphia — 12 - Streets DepartmentPhiladelphia, Pennsylvania#B2728162

The City of Philadelphia is soliciting bids for traffic signal and pedestrian infrastructure improvements on Crescentville Road from Adams Avenue to Cheltenham Avenue. The scope includes full construction of traffic signals, pedestrian crosswalks, curb ramps, sidewalks, and related stormwater and erosion control. Work must comply with PennDOT and City standards, including ADA and MUTCD. The contractor is responsible for traffic control, erosion control, and coordination with SEPTA and emergency services.

On PublicBidSearch: the original bid posting, 12 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Nov 19, 2026
Time stated in bid documents
Nov 19, 2026, 10:30 AM Eastern Time
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
electronic portal
Contract term
3 years + Two additional one-year renewal terms
Documents analyzed
12 published · 8 analyzed

Scope of work

  • Install traffic signal heads and controllers at intersections
  • Construct ADA-compliant curb ramps and sidewalks
  • Install fiber optic backbone and drop cables
  • Provide traffic control and erosion control during construction
  • Replace existing inlets and install new stormwater inlets
  • Install video-radar detection systems and CCTV cameras

Steps to Bid

  1. 1

    Complete and submit the bid through the PHLContracts portal using the Seller Quote Checklist. was Nov 19, 2026, 10:30 AM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Submission

Electronic portal

NAICS

237130

Get alerts for bids like this

New paving bids in Pennsylvania

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

The scope includes full construction of traffic signals, pedestrian crosswalks, curb ramps, sidewalk and curb installations, traffic control devices, conduit and cable installations, fiber optic interconnects, and related stormwater and erosion control measures. Work will be performed in two stages with temporary traffic control and coordination with SEPTA, emergency services, and local municipalities. The project includes installation of new signal heads, LED countdown pedestrian signals, video-radar detection systems, and a fiber optic backbone connection to the city's ATMS system.

Documents

  • Seller_Quote_Checklist_Bid_3008.pdf2 pages
  • bidDetail.sda
  • 06_3008_ADA_Plans_final_05.13.26.pdf17 pages
  • 06a_3008_ES_Plans_final_4.21.26.pdf
  • 06b_3008_Interconnect_Plan_final_4.21.26.pdf3 pages
  • 06c_3008_MPT_Plan_final_4.21.26.pdf6 pages
  • 06d_3008_Traffic_Signal_Plans_signed_5.4.26.pdf
  • 06e_3008_Roadway_Plans_final_05.07.26.pdf14 pages

4 more files

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby