OpenSuppliesCloses Dec 7, 2026

Rack, Ammunition Stowage (NSN: 2590-01-523-3197)

Department of Defense — Defense Logistics AgencyNationwide (Federal)#SPE7L0-27-T-0094

The U.S. Department of Defense, through the Defense Logistics Agency (DLA), is soliciting quotations for 2 units of Rack, Ammunition Stowage (NSN: 2590-01-523-3197). Delivery is FOB Origin to Anniston Army Depot, AL. A First Article Test (FAT) is required for one unit, with notice to the Contracting Officer and QAR at least 14 days prior to shipment. The FAT report must be submitted within 120 days of contract award. Packaging must follow ASTM D3951 and MIL-STD-129. Inspection and acceptance occur at origin. Offerors must comply with domestic material restrictions (Berry Amendment, Buy American Act). Additive manufacturing is prohibited. Quotations must be submitted via DIBBS at [link available with Pro].

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 7, 2026
Submission
electronic portal
Documents analyzed
1

Steps to Bid

  1. 1

    Register on DIBBS if not already registered.

  2. 2

    Review the full solicitation document (SPE7L027T0094.PDF) and DLA Master Solicitation for Automated Simplified Acquisitions Revision 106.

  3. 3

    Submit a quotation via the DLA Internet Bid Board System (DIBBS) at Official linkPro by 04:59 AM on December 7, 2026 (local time). by Dec 7, 2026, 4:59 AM

  4. 4

    If unable to quote, submit a 'No Bid' quotation via DIBBS with an anticipated quote date or reason. by Dec 7, 2026, 4:59 AM

What you'll need

Submission

Electronic portal

NAICS

336390

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

First Article Test (FAT) required: 1 unit must be tested per FAR 52.209-3. DLA Master List of Technical and Quality Requirements takes precedence over ASTM D3951. Additive manufacturing is not permitted. No bid type of 'No Bid' may be submitted if the offeror anticipates quoting after the closing date.

Key dates

Questions due
Dec 7, 2026, 4:59 AM
Bids due
Dec 7, 2026

Documents

  • SPE7L027T0094.PDF23 pages

See all documents · Download with Pro

More from this agency

Similar bids nearby

Closing soon nearby