OpenRFPCloses Dec 21, 2026

Rail Propulsion Battery Energy Storage Systems (BESS) for Safety Research

Office of the Secretary — 6913G6 VOLPE NATL. TRANS. SYS CNTRBoone, Garfield, Colorado#6913G627Q300007

The U.S. Acceptable chemistries include LFP, LTO, and NMC. Each system must have at least 75% capacity, with full technical specifications and engineering drawings (in CAD) provided within three weeks of award. Delivery must occur within 18 weeks of award to the Transportation Technology Center in Boone, CO. The Government will inspect and accept the items at the delivery site. The solicitation incorporates FAR and TAR clauses by reference, including those on disputes, payment, and compliance with laws.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 21, 2026
Submission
email
Documents analyzed
2

Scope of work

  • Include battery packs, protective enclosures, structural components, mounting brackets, and hardware
  • Must use commercially deployed chemistries: LFP, LTO, or NMC

Steps to Bid

  1. 1

    Register in Official linkPro and ensure active status.

  2. 2

    Review the solicitation, Statement of Work (Attachment 1), and incorporated clauses (Attachment 2) in full.

  3. 3

    Submit all questions by email to [email available with Pro] no later than December 11, 2026, at 1:00 PM EDT. Include the solicitation number in the subject line. by Dec 11, 2026, 1:00 PM

  4. 4

    Prepare and submit a quote via email to [email available with Pro], including all required technical and pricing information.

  5. 5

    Ensure the quote includes: (1) a description of the three BESS units; (2) general arrangement diagrams; (3) schematics or images of the protective structure; (4) mounting hardware details; (5) a statement confirming delivery of engineering drawings within three weeks of award; (6) unit pricing for 0

What you'll need

Contract duration

18 calendar weeks from award date

Submission

Email

NAICS

336510

How to submit

Submit all documentation via email to [email available with Pro]. The email must include the solicitation number in the subject line. The quote must contain all required technical and pricing information as specified in the Instructions to Offerors and the Statement of Work.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The U.S. The contractor must provide general arrangement diagrams, schematics or images of the protective structure, mounting hardware, and engineering drawings (in CAD format) of the battery enclosure and mounting hardware. All technical documentation must be delivered electronically within three weeks of award. Destination. The solicitation is issued under FAR Subpart 12, Commercial Items, with deviations effective through Federal Acquisition Circular 2026-01.

Key dates

Questions due
Dec 11, 2026, 1:00 PM Mountain Time
Bids due
Dec 21, 2026

Documents

  • 6913G627Q300007_Attachment_1-SOW.pdf3 pages
  • 6913G627Q300007_Attachment_2.pdf7 pages

See all documents · Download with Pro

Similar bids near Boone

Closing soon near Boone