Real Bird Way and North Main Street Intersection Improvements Project
City of SheridanSheridan, Wyoming#10349797
The City of Sheridan, Wyoming is soliciting sealed bids for the reconstruction of the Real Bird Way and North Main Street intersection. Work includes concrete and asphalt paving, curbs, sidewalks, signage, fill, and site restoration. Bids must be submitted in sealed envelopes to the City of Sheridan, Customer Service, Attn: Thomas Morneau, 55 Grinnell Plaza, Sheridan, Wyoming 82801, by 2:00 PM local time on December 9, 2026. Bids will be opened at the Council Chambers, 3rd floor, City Hall. A pre-bid conference is mandatory and will be held on November 18, 2026, at 2:00 PM local time at the same location. Bid security is required. Contract documents are available online at [link available with Pro] and via [link available with Pro] using project number 10349797.
On PublicBidSearch: the newspaper notice and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Dec 9, 2026
- Time stated in bid documents
- Dec 9, 2026, 2:00 PM Mountain Time
- Submission
- mail, hand delivery
- Required submission items
- 1 items · full checklist with Pro
Scope of work
- Reconstruct intersection with 590 SY of 8” concrete pavement
- Install 110 SY of 4” asphalt pavement
- Construct curb and gutter type B (336 LF)
- Install concrete double gutter (106 SY)
- Build concrete fillet and curb (36 SY)
- Construct 4” concrete sidewalk (291 SY)
Steps to Bid
- 1
Obtain contract documents from Official linkPro or Official linkPro using project number 10349797.
- 2
Attend the mandatory pre-bid conference on November 18, 2026, at 2:00 PM local time at the Council Chambers, 3rd floor, City Hall, Sheridan, Wyoming. by Nov 18, 2026, 2:00 PM
- 3
Prepare and complete all bid forms as required in the Project Manual.
- 4
Include bid security payable to the City of Sheridan, as required by the Instruction to Bidders.
- 5
Submit sealed bid in a sealed envelope addressed to: City of Sheridan, Customer Service, Attn: Thomas Morneau, Real Bird Way and North Main Street Intersection Improvements, 55 Grinnell Plaza, Sheridan, Wyoming 82801. by Dec 9, 2026, 2:00 PM
What you'll need
Submission
Mail, Hand delivery
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 1-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Scope includes: 8” concrete pavement (590 SY), 4” asphalt pavement (110 SY), curb and gutter type B (336 LF), concrete double gutter (106 SY), concrete fillet and curb (36 SY), 4” concrete sidewalk (291 SY), pre-formed pavement markings (132 LF), new sign and post installations (5 EA), imported fill (105 CY), topsoil stripping, stockpiling, placing, seeding, and erosion control blanket. All bids must be submitted on forms included in the Project Manual. Each bidder must include bid security payable to the City of Sheridan, as per the Instruction to Bidders. Bids remain open for 60 days after the opening.
Key dates
- Pre-bid meeting
- Nov 18, 2026, 2:00 PM Mountain Time
- Bids due
- Dec 9, 2026
Similar open bids
- Pershing and Windmill Intersection & Signal — City of Cheyenne
Closing this week nearby
- Food Waste Facility Insulation — Teton County, Wyoming — closes Nov 17, 2026
- Teton County Food Waste Facility Insulation Project — closes Nov 17, 2026
- WYOMING 988 SYSTEM EVALUATION — closes Nov 17, 2026
- Buckboard Marina Water System Improvements, Flaming Gorge Ranger District, Ashley National Forest, Wyoming — closes Nov 17, 2026
- New Rendezvous Elementary School CMAR Services — Request for Proposal — closes Nov 17, 2026