RECS RFP Design HVAC Controls & VAV Upgrade
Minnesota Department of Administration - Real Estate & ConstructionMinnesota#2000018906
This is a professional services RFP for engineering design and construction management to replace all existing HVAC controllers with current Honeywell models at the Judicial Building and Capitol Complex in St. Paul, MN. The scope includes architectural, structural, mechanical, electrical, and low-voltage systems. Bidders must be qualified engineering firms. Submissions are due via the SWIFT system.
On PublicBidSearch: the original bid posting for this bid.
Overview
- Due
- Jan 13, 2027, 12:00 PM CT
- Time stated in bid documents
- Jan 13, 2027, 12:00 PM Central Time
- Submission
- electronic portal
Scope of work
- Design and manage construction for HVAC control system upgrade
- Project number: 02JC0046
Steps to Bid
- 1
Register in the Supplier Portal and log in to the SWIFT system.
- 2
Review the full RFP and scope of work via the Supplier Portal.
- 3
Submit the response through the SWIFT system by the due date. by Jan 13, 2027, 12:00 PM
What you'll need
Submission
Electronic portal
NAICS
541330, 541610, 541620
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Key dates
- Bids due
- Jan 13, 2027, 12:00 PM CT
More from this agency
- RFP for Mechanical Engineer to Design and Manage BAS System Upgrades at Faribault and Red Wing DOC Campuses — closes Nov 23, 2026
- RFP for Mechanical Engineer Services to Design Replacement of BCA Lab Controls System — closes Nov 24, 2026
- RFP for Architectural, Civil, Mechanical, and/or Structural Engineering Services to Design Roof Replacement and… — closes Dec 4, 2026
- RFP for Architectural, Structural, Mechanical, and Electrical Services to Prepare Design Documents for Deferred… — closes Dec 17, 2026
Similar open bids
- General Engineering Consultant (GEC) for Preconstruction Services Master Contract — Minnesota DOT
- Historic Roadside Properties and Waysides: Historic Architect Design and Contract Administration - Fiscal Year 2027… — Minnesota DOT
- Rail System Maintenance Engineering Service — Metropolitan Council
- DHS/Women Experiencing Substance Use Disorder Recovery Evaluation — Minnesota Department of Human Services
Closing this week nearby
- I-494 in Maple Grove to East of TH 252 in Fridley - Sign Replacement — closes Nov 18, 2026
- I-494 in Maple Grove to east of TH 252 in Fridley - Sign Replacement — closes Nov 18, 2026
- Retrofit Railing on Bridge 4190 (Mendota Bridge), Trunk Highway 55/62 Over the Minnesota River — closes Nov 18, 2026
- Resurfacing of State Highway 59 from TH 14 to 0.61 Miles South of TH 23 and State Highway 167 from Cul-de-Sac to TH 23… — closes Nov 18, 2026
- MnDOT SP 1115-28: CR 1 S in Pillager to TH 10 in Motley - Mill & Overlay, Roundabout Construction, and Bridge… — closes Nov 18, 2026