Remanufacture of B-2 Actuator, Electromechanical, Rotary
Dept of the Air Force — FA8118 AFSC PZABBOklahoma#FA8118-27-R-0001
This is a firm-fixed-price requirements type contract for the remanufacture of B-2 Actuator, Electromechanical, Rotary. Funds are contingent upon availability. A Pre-Award Survey and Initial Production Evaluation (IPE) are required. The contractor must restore the end item to a like-new condition, including all necessary packing and preservation. Qualification requirements apply, and interested vendors must submit a Source Approval Request (SAR) package. Item Unique Identification (IUID) marking is required. An ombudsman is available to address concerns. The contractor must manage supply chain risks, including continuity of operations, foreign influence, and cybersecurity. Foreign contractor participation is excluded unless authorized. Cybersecurity requirements reference NIST SP 800-161, NIST SP 800-53, and NIST SP 800-171.
On PublicBidSearch: the original bid posting, 15 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Nov 19, 2026, 2:00 PM CT
- Time stated in bid documents
- Nov 19, 2026, 2:00 PM Central Time
- Submission
- electronic portal
- Contract term
- 3-YEAR BASIC
- Documents analyzed
- 15 published · 13 analyzed
Scope of work
- Includes disassembly, cleaning, inspection, assembly, testing, and finishing.
- Comply with applicable Technical Orders (TOs) and OEM specifications.
- Replace all consumable parts with new parts.
Steps to Bid
- 1
Submit Source Approval Request (SAR) package if not previously qualified.
For questions regarding the Tinker SAR Process or related issues, these inquiries should be submitted to the TAFB Small Business Office at: AFSC/SB, 3001 Staff Drive, Suite 1AG 85A, Tinker AFB, OK 73145-3009. Email: [email available with Pro] Website: [link available with Pro]. The actual SAR package submission itself shall be submitted electronically through DoD SAFE at [link available with Pro].
- 2
Submit proposal by the due date. was Nov 19, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Prequalification
RequiredSubmission
Electronic portal
NAICS
336413
How to submit
The SAR package submission itself shall be submitted electronically through DoD SAFE at Official linkPro. If you have a PKI Certificate, the SAR can be sent directly to the email address below via DoD SAFE. If you do not have a PKI Certificate, then you must send a standard email message to the email address below and ask that they “Request a Drop-Off” to your email via DoD SAFE, which will enable you to be able to upload the SAR Submission Package documents to DoD SAFE. [email available with Pro].
Get alerts for bids like this
New IT and technology bids in Oklahoma
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
The contract is for a 3-year basic period. Funds are not presently available for this contract, and the government's obligation is contingent upon the availability of appropriated funds. The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture to restore the end item to a like-new condition, including all necessary packing and preservation. All work must be completed in accordance with specified requirements, technical orders, and/or cost associated with Over and Above requests (excluding missing parts). The government will only pay for missing components after review and approval of Over and Above requests. Government property furnished for repair is subject to specific contract clauses. End items determined to be beyond overhaul limits will have costs for work performed prior to determination included in the unit price. Contractors must promptly notify the administrative contracting officer (ACO) if an item is not reparable. Any effort performed before contract execution is at the contractor's own risk. Condemned units will not be counted as production. The awardee is responsible for securing necessary parts for long lead-time components to meet the delivery schedule. DFARS clause 252.217-7001, Surge Option, may be invoked, with quantities and prices negotiated at that time. Item Unique Identification (IUID) marking is required per DFARS 252.211-7003. Dates in clauses 52.216-19 and 52.216-21 are based on the estimated award date and will be revised prior to award. The contractor must include a DD1348-1 when assets are shipped, as per CAV AF Reporting Requirements. An ombudsman has been appointed to facilitate resolution of concerns from offerors. The remanufacture process includes disassembly, cleaning, inspection, maintenance, re-assembly, testing, and finishing actions. Consumable parts replacement is required at 100% with new parts. Over and Above requests are for missing components or damage unrelated to normal use, requiring PCO approval. Each remanufactured end item must be marked with the contractor's CAGE and date of remanufacture. Quality acceptance is performed by DCMA. Shipments are by Commercial Bill of Lading (CBL) by the fastest traceable means. The contractor must comply with CAV AF requirements and print DD1348-1A from CAVAF for shipments. Contract Request Forms are used for condemnation, component removal, or over and above requests. The delivery schedule must be met. Applicable Technical Orders include 6J3-8-24-3, 00-5-1, 00-5-3, 00-25-260, and 00-35D-54. Other applicable publications include AFI 23-101, AFMAN 23-122, various DoD/GSA/Air Force forms, and MIL-STD-130. Supply chain risk management (SCRM) is required, including a SCRM plan addressing continuity of operations, foreign influence, and cybersecurity. A Continuity of Operations Plan (COOP) is required. Foreign Disclosure Restrictions apply. A system security plan and incident-handling capability plan are required.
Documents
- download
- Commercial_Asset_Visibility_Air_Force_Reporting.docx
- Statement_of_Work.pdf33 pages
- Transportation_Data.pdf2 pages
- Packaging_Requirement.pdf1 pages
- Contract_Data_Requirements_List.pdf6 pages
- DI-SESS-80776B_Technical_Data_Package.pdf2 pages
- DI-MGMT-80503_Report_of_Shipping_and_Packaging_Discrepancy.pdf5 pages
7 more files
More from this agency
- Remanufactured E-3 AI Gearbox Assembly — closes Nov 20, 2026
- Med. Press. Pump Module Motor Rebuild — closes Nov 20, 2026
- KC-135 Center Console Refresh (CCR) Revision 2 — closes Nov 20, 2026
- Repair of B-2 Thrust Control Actuator — closes Nov 20, 2026
- OH B2 ACTUATORS — closes Nov 20, 2026
Similar open bids
- Adair Indep School District 2: E-Rate FY2027 Category 2 - Cabling and Antennas, Connectors, and Related Components — Adair Indep School District 2
- Sulphur Independent School District 1: E-Rate FY2027 Category 1 - Internet Access and Data Transmission Service;… — Sulphur Indep School Dist 1
- Valve Assembly, Hydr (Steel Alloy) – Solicitation Extension — DEFENSE LOGISTICS AGENCY
- Stonewall Public Schools: E-Rate FY2027 Category 2 - Switches, UPS/Battery Backup, Software, and Licenses — Stonewall Public Schools
Closing this week nearby
- Provide Fast-Track Turn-Key Design-Build Services for Casino — closes Nov 19, 2026
- One (1) New or Used Semi for Grady County District 2 — closes Nov 19, 2026
- Mooreland Public Library: E-Rate FY2027 Internet Access and Data Transmission Service; Category One Network Equipment — closes Nov 19, 2026
- Wright City School District 39: E-Rate FY2027 Category 2 – Switches and Wireless Access Points with Software,… — closes Nov 19, 2026