Replace Fire Alarm and Sprinkler Systems at Hill Correctional Center
Illinois Capital Development BoardGalesburg, Illinois#120-095-020
The Illinois Capital Development Board is soliciting bids to replace fire alarm and sprinkler systems at the Hill Correctional Center in Galesburg, IL. The work includes full design, supply, installation, testing, and commissioning of new systems. The project is delivered via Single-Prime (Electrical) method. A project labor agreement applies. The contract value is less than $3.5 million. The project is located at 600 S Linwood Rd, Galesburg, IL 61401.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 1, 2026, 11:00 AM CT
- Time stated in bid documents
- Dec 1, 2026, 11:00 AM Central Time
- Submission
- mail, hand delivery
- Documents analyzed
- 3
- Required submission items
- 2 items · full checklist with Pro
Scope of work
- Replace full sprinkler system including piping, heads, and control valves
- Install new fire alarm control panel and addressable system
- Provide full testing, commissioning, and certification
- Comply with NFPA 72 and NFPA 13 standards
Steps to Bid
- 1
Review the solicitation documents, including the revised solicitation dated November 5, 2026, and all attachments.
- 2
Obtain plans and specifications from Dewberry Engineers, Inc., 401 Southwest Water St., Suite 701, Peoria, IL 61602. A $100 plan deposit is required.
- 3
Submit a complete bid package by December 1, 2026, at 11:00 AM CDT. by Dec 1, 2026, 11:00 AM
What you'll need
Contract duration
Not specified
Submission
Mail, Hand delivery
NAICS
238210
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- The 2-item required-submittals checklist
Cancel anytime · no card to browse
Project details
A project labor agreement (PLA) is applicable. Site access requires prior notification to the facility and valid photo ID. The scope includes all necessary electrical and plumbing work, coordination with existing building systems, and compliance with NFPA 72 and NFPA 13 standards. The contract is for less than $3,500,000.
Key dates
- Pre-bid meeting
- Sep 30, 2026, 10:30 AM Central Time
- Bids due
- Dec 1, 2026, 11:00 AM CT
Documents
- 120-095-020_Solicitation_-_Electrical.pdf1 pages
- 120-095-020_Revised_Solicitation_-_Electrical.pdf1 pages
- 120-095-020_Revised_Solicitation_-_Electrical1.pdf1 pages
More from this agency
- Demolition, Construction, and Renovation of Buildings (General- Remod & Rehab) · closes Dec 15, 2026
- Upgrade Water Distribution System (General- Remod & Rehab) · closes Dec 15, 2026
- Plan and Begin Campus Sewer Line Replacement · closes Dec 15, 2026
- Replace Flooring, Pneumatic Controls and HVAC Units at Black Hawk Community College, Galva, IL · closes Dec 15, 2026
- Plan and Begin Campus Steam Line and Tunnel Repairs · closes Dec 15, 2026
Closing soon near Galesburg
- Procurement of a Complete, Stationary, Top-Loading Electric Deep Pit Furnace for Rock Island Arsenal · Rock Island · closes Nov 28, 2026
- Invitation to Bid: iTero Lumina Pro · East Peoria · closes Nov 30, 2026
- Advertisement for Bids: City Hall Fire Alarm Upgrades · Macomb · closes Dec 1, 2026
- Cleaning Services for City Hall and Aledo Police Department · Aledo · closes Dec 2, 2026
- Cleaning Services for Aledo City Hall and Aledo Police Department · Aledo · closes Dec 2, 2026