OpenIFBCloses Dec 7, 2026, 2:00 PM CT

Replace HVAC Systems at Bentsen-Rio Grande State Park

Parks & Wildlife Department - 802Texas#802-27-86722

This Invitation for Bids (IFB) seeks a contractor to replace three (3) existing HVAC systems (two for the Park Store and one for the Exhibit Room) at Bentsen-Rio Grande State Park in Mission, Texas. The scope includes replacing air handlers and condenser units. The project must be completed within 45 calendar days. Bidders must demonstrate at least three successful projects of similar scope within the past five years. Prevailing wage rates apply. A bid bond of not less than five percent (5%) of the total bid amount is required for projects exceeding $25,000.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 7, 2026, 2:00 PM CT
Time stated in bid documents
Dec 7, 2026, 2:00 PM Central Time
Bid bond
5%
Submission
email
Contract term
forty-five (45) calendar days
Documents analyzed
1

Scope of work

  • Install new 16 SEER split systems with R410A refrigerant.
  • Provide and install new programmable digital thermostats.
  • Contractor responsible for removal and proper disposal of old systems.

Steps to Bid

  1. 1

    Field verify all measurements, quantities, types, specifications and equipment for accuracy before installation.

    Contractor shall field verify all measurements, quantities, types and specifications and equipment for accuracy before installation.

  2. 2

    Submit bid security (if applicable).

    Projects with a total contract price exceeding $25,000 require bid security in the form of a bond for not less than five percent (5%) of the total amount of the Bid. Bidder shall submit a .pdf file of the bid security documents with their bid.

What you'll need

Bid security

Required

Unless otherwise stipulated in the Invitation for Bids and Contract Documents, only projects in which the total contract price exceeds $25,000 will require bid security. The bid security shall be in the form of a bond accompanied by valid power of attorney for not less than five percent (5%) of the total amount of the Bid, including the total of all separate priced items and multiple base pricing items and/or alternate price items and/or optional pricing and/or allowances. To ensure adequate bid security, Bidders should calculate bid security based on the highest possible monetary award. Bidder shall submit a .pdf file of the bid security documents with their bid. Bids will be rejected if the appropriate bid security is not furnished in the form specified above and by the time set for receipt of Bids.

Contract duration

45 calendar days

Submission

Email

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Contractor shall field verify all measurements, quantities, types, specifications, and equipment for accuracy before installation. All work must be performed in accordance with standard industry practices and applicable codes. The project must be completed within forty-five (45) calendar days from the Notice to Proceed or Authorization to Proceed with Construction Activities. Contractor must provide a minimum ten (10) year warranty on the compressor, five (5) year parts warranty, and one (1) year labor warranty. Bidders must submit Attachment D – Contractor’s Qualifications Form and Attachment E – Bid Schedule.

Key dates

Questions due
Nov 30, 2026, 2:00 PM Central Time
Bids due
Dec 7, 2026, 2:00 PM CT

Documents

  • ESBD_578391_1795200529980_IFB_802-27-86722_Replace_HVAC_Bentsen_Rio_Grande_V.pdf45 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby