Replace Superstructure - WBL over Sand Creek, 2.04 miles E of SR 3 (Decatur County), I-74
Indiana DOT — INDOTDecatur, Indiana#B-44408
INDOT is seeking bids to replace the superstructure on the westbound lane of I-74 over Sand Creek, 2.04 miles east of SR 3 in Decatur County, IN. The scope includes full removal of existing pavement and bridge components, excavation, subgrade treatment, new substructure and superstructure construction, paving with multiple HMA layers, installation of new guardrails and safety systems, stormwater management, and temporary traffic control. The project is in the Seymour District. The engineer's estimate for this project is $3,134,746.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Mar 10, 2027
- Time stated in bid documents
- Mar 10, 2027, 11:59 PM Eastern Time
- Submission
- electronic portal
- Contract term
- 36 months + Two additional one-year renewal terms
- Documents analyzed
- 1
Scope of work
- Remove existing pavement, guardrails, and bridge approach structures
- Excavate and treat subgrade, install new substructure concrete
- Install new structural steel and reinforced concrete elements
- Construct new bridge deck and superstructure
- Pave with multiple layers of HMA (hot-mix asphalt)
Steps to Bid
- 1
Register with INDOT's eProcurement system (if not already registered).
- 2
Review the full bid package, including the Quantity Calculations File (STG2_QtyCalcs_2200498_for_Bridge_Services.pdf), for technical specifications and scope details.
- 3
Submit any questions to the INDOT solicitation contact by the deadline of 23:59 ET on February 10, 2027. by Feb 10, 2027, 11:59 PM
What you'll need
Submission
Electronic portal
NAICS
237130
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project is part of Contract B-44408, which also includes the eastbound (EBL) bridge replacement. The work includes construction of riprap, underdrains, and inlet protection. The project is located in the Seymour District, with the work site on I-74. The engineer's estimate for this specific project (DES# 2200498) is $3,134,746.
Key dates
- Questions due
- Feb 10, 2027, 11:59 PM Eastern Time
- Bids due
- Mar 10, 2027
Documents
- STG2_QtyCalcs_2200498_for_Bridge_Services.pdf97 pages
More from this agency
- Scour Protection - SR 129 Bridge over LONG RUN, 0.28 Mile North of SR 56, Switzerland County · closes Dec 9, 2026
- Bridge Deck Replacement and Overlay Work on I-65 in Jasper County, Indiana — R-44640 · closes Mar 10, 2027
- Pavement Patching - FY27 Non-I Patching #2 throughout the LaPorte District - specific locations coming · closes Mar 10, 2027
- Bridge Rehabilitation or Repair — SR 75 at Milepost 01.64 North of SR 26, Carroll County, Indiana · closes Mar 10, 2027
- Resurfacing and Improvements to State Road 1043 from Voorde Drive to Lathrop Street, St. Joseph County · closes Mar 10, 2027
Similar bids near Decatur
- Adams County 2027 HMA Overlay Project · Decatur · closes Dec 8, 2026
- CU 2027 Asphalt Patching Package 2 - Northwest · Fort Wayne · closes Dec 10, 2026
- Asphalt Overlay, Rehabilitation, and Maintenance — City Utilities, Fort Wayne, IN — Package 1, Northeast Sector · Fort Wayne · closes Jan 7, 2027
- CU 2027 Asphalt Patching Package 1 - Northeast · Fort Wayne · closes Dec 10, 2026
- Anthis and FACE Site Improvements — Bid 101897 · Fort Wayne · closes Dec 1, 2026
Closing soon near Decatur
- General Aviation Hangar 2070 · Fort Wayne · closes Nov 30, 2026
- RFP 10.26.26 – Turnkey Development Partner · Fort Wayne · closes Nov 30, 2026
- Botanical Conservatory Gallery Corridor Renovation · Fort Wayne · closes Dec 3, 2026
- 1100N - Decatur Road Sidewalk – Pettit Ave. to Hanna St. · Fort Wayne · closes Dec 3, 2026
- Grease & Oil · Fort Wayne · closes Dec 4, 2026