OpenRFPCloses Dec 18, 2026

Replacement of Diesel Generator and Upgrade of Current Manual Fill Diesel Tank

Supreme Court of OhioColumbus, Ohio#RFP 400

Moyer Ohio Judicial Center in Columbus, OH. The generator must match the Kohler Model 400ROZ87 specifications, including 350 kW continuous / 400 kW standby, 120/208V, 3-phase, 60 Hz, 1800 RPM, and fit through a 72” x 72” louver. Both projects must be completed by June 30, 2027. Proposals must be submitted via email to Brent Flanik by December 18, 2026, at 12:00 p.m. EST. Questions must be submitted by December 7, 2026, at 12:00 p.m. EST. A site walkthrough is scheduled for December 2, 2026, at 1:00 p.m. EST, with confirmation required by December 1. Evaluation is based on price (50%), timeline and approach (35%), and references/experience (15%). The successful contractor must carry $2M per occurrence CGL, $1M per accident auto liability, Ohio workers’ comp, and $2M per occurrence professional liability insurance. The Court must be named as an additional insured. Certificates of insurance must be provided before work begins. Proposals are firm for 180 days.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 18, 2026
Time stated in bid documents
Dec 18, 2026, 12:00 PM Eastern Time
Submission
email
Contract term
from its date of execution through June 30, 2027, or until successful completion of the projects including all elements outlined in Section 4 (Scope of Work), w
Documents analyzed
1

Scope of work

  • Install new fuel filtration, water separators, and limit switches
  • Provide 2-year onsite warranty with preventive maintenance for generator

Steps to Bid

  1. 1

    Submit questions in writing to Brent Flanik by December 7, 2026, at 12:00 p.m. EST. by Dec 7, 2026, 12:00 PM

  2. 2

    Attend the site walkthrough on December 2, 2026, at 1:00 p.m. EST (optional but encouraged). by Dec 2, 2026, 1:00 PM

  3. 3

    Confirm attendance at the walkthrough by emailing Brent Flanik by December 1, 2026, at 12:00 p.m. EST. by Dec 1, 2026, 12:00 PM

What you'll need

Submission

Email

NAICS

237130, 237199, 333911, 333912

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Both projects are to be completed at the Thomas J. Moyer Ohio Judicial Center, 65 South Front Street, Columbus, Ohio. The new generator must include a 2-year extended warranty with onsite preventive maintenance, and all freight, handling, and delivery must be F.O.B. Destination, Freight Prepaid and Allowed. The site access requires equipment to fit through a 72” x 72” louver, 24” off the ground. 10 feet apart), new fuel filtration and water separators, high and low limit switches, and replacement or upgrade of the inoperable current unit. The Court will not issue minutes from the walkthrough. Respondents must provide three references from similar projects completed in the last three years. The Court reserves the right to reject any or all proposals. The Court is exempt from state and federal excise taxes. Contracts will be awarded separately for each project.

Key dates

Questions due
Dec 7, 2026, 12:00 PM Eastern Time
Pre-bid meeting
Dec 2, 2026, 1:00 PM Eastern Time
Bids due
Dec 18, 2026

Documents

  • RFP400.pdf42 pages

See all documents · Download with Pro