Replacement of Diesel Generator and Upgrade of Current Manual Fill Diesel Tank
Supreme Court of OhioColumbus, Ohio#RFP 400
Moyer Ohio Judicial Center in Columbus, OH. The generator must match the Kohler Model 400ROZ87 specifications, including 350 kW continuous / 400 kW standby, 120/208V, 3-phase, 60 Hz, 1800 RPM, and fit through a 72” x 72” louver. Both projects must be completed by June 30, 2027. Proposals must be submitted via email to Brent Flanik by December 18, 2026, at 12:00 p.m. EST. Questions must be submitted by December 7, 2026, at 12:00 p.m. EST. A site walkthrough is scheduled for December 2, 2026, at 1:00 p.m. EST, with confirmation required by December 1. Evaluation is based on price (50%), timeline and approach (35%), and references/experience (15%). The successful contractor must carry $2M per occurrence CGL, $1M per accident auto liability, Ohio workers’ comp, and $2M per occurrence professional liability insurance. The Court must be named as an additional insured. Certificates of insurance must be provided before work begins. Proposals are firm for 180 days.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 18, 2026
- Time stated in bid documents
- Dec 18, 2026, 12:00 PM Eastern Time
- Submission
- Contract term
- from its date of execution through June 30, 2027, or until successful completion of the projects including all elements outlined in Section 4 (Scope of Work), w
- Documents analyzed
- 1
Scope of work
- Install new fuel filtration, water separators, and limit switches
- Provide 2-year onsite warranty with preventive maintenance for generator
Steps to Bid
- 1
Submit questions in writing to Brent Flanik by December 7, 2026, at 12:00 p.m. EST. by Dec 7, 2026, 12:00 PM
- 2
Attend the site walkthrough on December 2, 2026, at 1:00 p.m. EST (optional but encouraged). by Dec 2, 2026, 1:00 PM
- 3
Confirm attendance at the walkthrough by emailing Brent Flanik by December 1, 2026, at 12:00 p.m. EST. by Dec 1, 2026, 12:00 PM
What you'll need
Submission
NAICS
237130, 237199, 333911, 333912
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Both projects are to be completed at the Thomas J. Moyer Ohio Judicial Center, 65 South Front Street, Columbus, Ohio. The new generator must include a 2-year extended warranty with onsite preventive maintenance, and all freight, handling, and delivery must be F.O.B. Destination, Freight Prepaid and Allowed. The site access requires equipment to fit through a 72” x 72” louver, 24” off the ground. 10 feet apart), new fuel filtration and water separators, high and low limit switches, and replacement or upgrade of the inoperable current unit. The Court will not issue minutes from the walkthrough. Respondents must provide three references from similar projects completed in the last three years. The Court reserves the right to reject any or all proposals. The Court is exempt from state and federal excise taxes. Contracts will be awarded separately for each project.
Key dates
- Questions due
- Dec 7, 2026, 12:00 PM Eastern Time
- Pre-bid meeting
- Dec 2, 2026, 1:00 PM Eastern Time
- Bids due
- Dec 18, 2026
Documents
- RFP400.pdf42 pages
Similar bids near Columbus
- 2601 Dell PowerEdge M630 Maintenance · Columbus · closes Nov 27, 2026
- RFQ for Generator Preventive Maintenance, Load Testing, Repair, and 24/7 Emergency Response Services for COTA Facilities · Columbus · closes Nov 30, 2026
Closing soon near Columbus
- FCI Flow Switches · Columbus · closes Nov 30, 2026
- 6001-IQA-Translation Services · Columbus · closes Nov 30, 2026
- Building Envelope Upgrades – Window & Door Replacement at Walnut Ridge High School · Columbus · closes Dec 1, 2026
- Tire Bid for 2026-27 School Year · Columbus · closes Dec 1, 2026
- US 33-24.56 Bridge Hit Repair, Franklin County, Ohio · Franklin County · closes Dec 3, 2026