OpenIFBCloses Dec 31, 2026

2A Griffin Ave Reconstruction Project: Roadway, Storm Sewer, Water Main, and Irrigation System Reconstruction

Colorado Public Notice — StatewideColorado#59052

The City of Canon City is soliciting bids for the reconstruction of five blocks of Griffin Avenue between South 4th and South 9th Streets. Scope includes full roadway reconstruction, new storm sewer system, irrigation system improvements, and replacement of the water main and water services. Bids must be submitted electronically by December 30, 2026, at 11:59 PM MT. A non-mandatory pre-bid meeting is scheduled for December 1, 2026, at 11:00 AM in Canon City, CO. Questions must be submitted in writing to Leo Evans at [email available with Pro]. The solicitation was first published on November 18, 2026.

On PublicBidSearch: the newspaper notice and the agency contact (name and email) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 31, 2026
Time stated in bid documents
Dec 30, 2026, 11:59 PM Mountain Time
Submission
electronic portal

Scope of work

  • Reconstruct 5 blocks of Griffin Ave between 4th and 9th St
  • Install new storm sewer system to separate stormwater and irrigation
  • Replace existing water main and water services
  • Improve irrigation system along corridor
  • Full roadway reconstruction including paving and striping

Steps to Bid

  1. 1

    Register on BidNetDirect and access the bid documents at Official linkPro

  2. 2

    Attend the non-mandatory pre-bid meeting on December 1, 2026, at 11:00 AM at Room A002, South 128 Main Street, Canon City, CO 81212 (virtual details available on BidNet). by Dec 1, 2026, 11:00 AM

  3. 3

    Submit all required documents electronically via BidNetDirect by December 30, 2026, at 11:59 PM Mountain Time. by Dec 30, 2026, 11:59 PM

  4. 4

    Direct all questions in writing only to Leo Evans, Public Works Director, at [email available with Pro]. by Dec 30, 2026, 11:59 PM

What you'll need

Submission

Electronic portal

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Electronic bid submission is required via BidNetDirect. Attendance is recommended. A site tour may follow for interested attendees. All questions must be submitted in writing only to Leo Evans, Public Works Director, at [email available with Pro].

Key dates

Pre-bid meeting
Dec 1, 2026, 11:00 AM Mountain Time
Bids due
Dec 31, 2026

More from this agency

Similar bids in Colorado

Closing soon in Colorado