Request for Proposal (RFP) 2027-BANDON SD-C1: Dedicated Internet Access Service for Bandon School District 54
Bandon School District 54Bandon, Oregon#270003894
Bandon School District 54 is soliciting proposals for fully managed Dedicated Internet Access (DIA) services with 1 Gbps to 5 Gbps symmetrical bandwidth for five school sites. The District requires a fiber-based solution with a contiguous /27 public IPv4 address block. Proposals must include a detailed network design with a geographic fiber pathway map, SLA commitments for 99.99% availability and 1-hour response time, and a timeline for service activation. Special construction must be detailed in Attachment B. Proposers must be USAC-registered with a valid SPIN. The RFP is governed by Oregon law and FCC E-Rate rules. Proposals must be submitted electronically via the designated portal by December 17, 2026, at 4:00 PM PST.
On PublicBidSearch: the original bid posting, 10 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 18, 2026
- Time stated in bid documents
- Dec 17, 2026, 4:00 PM Pacific Time
- Submission
- electronic portal
- Contract term
- 3 years + 5 optional 1-year Voluntary Extensions
- Documents analyzed
- 10
Scope of work
- Provide a Service Level Agreement (SLA) guaranteeing 99.99% network availability.
- Include a timeline for service activation and a sample contract.
Steps to Bid
- 1
Submit questions to the Single Point of Contact (SPC) via email by November 25, 2026, at 4:00 PM PST. by Nov 25, 2026, 4:00 PM
- 2
Submit the complete proposal via the Electronic Submission Portal at Official linkPro by December 17, 2026, at 4:00 PM PST. by Dec 17, 2026, 4:00 PM
- 3
The proposal must be no more than 50 pages, excluding attachments, and must be submitted in PDF, DOCX, or XLSX format.
- 4
The proposal must be signed by an authorized representative and submitted electronically.
What you'll need
Submission
Electronic portal
NAICS
517110, 517120, 517190
How to submit
Submit via the Electronic Submission Portal at Official linkPro. The proposal must be in PDF, DOCX, or XLSX format and must not exceed 50 megabytes in total size. The proposal must be submitted electronically and cannot be sent by email or mail.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Proposals must include a detailed network design with a fiber pathway map showing proposed routes, including aerial or buried construction, ownership (Proposer-owned or subcontracted), and all demarcation points. The District strongly prefers buried fiber in armored conduit. Proposals must include a timeline for service activation, with all sites to be online by July 1, 2027, if possible. Special construction (if required) must be detailed in Attachment B, with cost allocation for excess fiber strands in accordance with FCC rules. The RFP is governed by Oregon Revised Statutes and the Federal Communications Commission’s E-Rate program.
Key dates
- Questions due
- Nov 25, 2026, 4:00 PM Pacific Time
- Bids due
- Dec 18, 2026
- Expected award
- Jan 14, 2027
Documents
- 22925809-USAC_FCC_FORM_470_APPLICATION_270003894_CERTIFIED.pdf5 pages
- 22899596-2027_BANDON_SD_C1_Attachment_A_Cost_Proposal_Form.xlsx
- 22899593-2027_BANDON_SD_C1_Attachment_B_Special_Construction_Worksheet.xlsx
- 22899586-2027_BANDON_SD_C1_Attachment_C_Proposer_Information_and_Certificat.docx
- 22899585-2027_BANDON_SD_C1_Attachment_D_Responsibility_Inquiry.docx
- 22899584-2027_BANDON_SD_C1_Attachment_E_Certified_Disadvantaged_Business_Ou.docx
- 22899583-2027_BANDON_SD_C1_Attachment_F_Disclosure_Exemption_Affidavit.docx
- 22899582-2027_BANDON_SD_C1_Attachment_G_Special_Construction_Cost_Allocatio.docx
2 more files
Similar open bids
- US 26 at SE 67th and SE 80th to SE 82nd Project — Department of Transportation
- CCCF Fire Panel Upgrade — Department of Corrections
- Jewell School: E-Rate FY2027 Category 1 - Standalone Data Transmission Service — Jewell School
- Seismic Retrofit of Building 16, Roseburg VAMC — VETERANS AFFAIRS, DEPARTMENT OF
- RFP for Use of 2200 Ashland Street Facility — City of Ashland
Closing this week nearby
- R6 Pacific Northwest Forestry Sciences Laboratory Small Autonomous Bio-Acoustic Recorders — closes Nov 17, 2026
- Ione School District: E-Rate FY2027 Category 1 - Standalone Data Transmission Service — closes Nov 18, 2026
- Multi-Site Security Upgrades — closes Nov 18, 2026
- Campus Food Services Vendor – RFP 26/27-01 — closes Nov 18, 2026
- Bulk Biomass Fuel Pellets for 2026/2027 Heating Season at Rees Training Center, Hermiston, Oregon — closes Nov 18, 2026