OpenRFPCloses Dec 14, 2026, 11:59 PM CT

E-Rate FY2027 Form 470: Network Switches, Optics, and Related Components – Kildeer Countryside Dist 96

Kildeer Countryside Dist 96Buffalo Grove, Illinois#270001802

The District prefers 48-port switches; 24-port models require justification. Proposals must be submitted by email by December 14, 2026, at 4:00 PM CDT. All equipment must be new, not refurbished or gray market. The earliest contract date is December 11, 2026.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 14, 2026, 11:59 PM CT
Submission
email
Documents analyzed
2

Scope of work

  • Replace 40 Layer 2 network switches with redundant power supplies
  • Supply 52 10 Gbps SFP+ LC multimode optical transceivers
  • Provide full turnkey implementation and configuration services
  • Deliver system documentation and electronic inventory within 30 days

Steps to Bid

  1. 1

    Submit questions by deadline was Nov 23, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

    Email all questions to Bob Hanrahan by Monday, November 23, 2026, at 10:00 AM CDT.

  2. 2

    Review District responses by Dec 1, 2026

    Check EPC for written responses to questions posted by Tuesday, December 1, 2026.

  3. 3

    Prepare and submit proposal

    Submit a complete proposal via email to [email available with Pro] by Monday, December 14, 2026, at 4:00 PM CDT. The proposal must include a signed cover letter, itemized pricing, qualifications, references, and compliance documentation.

What you'll need

Submission

Email

NAICS

541512, 541513

How to submit

Submit all questions and proposals via email to [email available with Pro]. Proposals must be in PDF format. Include a signed cover letter and all required documentation.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The District requests up to 40 rack-mountable Layer 2 switches with redundant power supplies, preferably 48-port models. If proposing 24-port switches, bidders must identify quantities, locations, and justification. Also requested are up to 52 compatible 10 Gbps SFP+ LC multimode optical transceivers or equivalent. The scope includes all required hardware, accessories, uplink modules, and compatible optics. Required items: manufacturer model, part number, quantity, unit price, extended price, and applicable term. Pricing must be broken down by school and phase for 38 allocated switches, with up to two additional switches priced separately. The District will confirm final locations. All proposals must be submitted via email to Bob Hanrahan. The earliest allowable contract date is 2026-12-11.

Key dates

Questions due
Nov 23, 2026, 10:00 AM Central Time
Bids due
Dec 14, 2026, 11:59 PM CT

Documents

  • 22929626-USAC_FCC_FORM_470_APPLICATION_270001802_CERTIFIED.pdf5 pages
  • 22927668-Kildeer_FY2027_Form_470_RFP_Final.pdf4 pages

See all documents · Download with Pro

Similar bids near Buffalo Grove

Closing soon near Buffalo Grove