OpenRFPCloses Dec 31, 2026

Request for Bids - E-Rate FY2027 Form 470: Switches and Necessary Software and Licenses; Switches; Antennas, Connectors, and Related Components; Cabling; Existing Equipment - Fairfield Community School Dst - Fairfield CSD FY2027 C2

Fairfield Community School DstGoshen, Indiana#270005103

The scope includes 10 Aruba 2930F switches or equivalent, 10 Aruba switches for maintenance, 20 antennas/connectors per entity (4 total), 20 feet of cabling per entity, and managed services for existing equipment. All items must be new and factory-sealed. Vendors may submit equivalent products. Installation is not required. Proposals must be emailed to Cody Stewart by 1:00 PM local time on December 31, 2026. Questions must be submitted by December 3, 2026. Bidders must comply with FCC E-Rate rules and USAC guidelines.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 31, 2026
Time stated in bid documents
Dec 31, 2026, 1:00 PM Eastern Time
Submission
email
Documents analyzed
2

Scope of work

  • Supply 10 Aruba 2930F 48G PoE+ 4SFP+ switches or equivalent
  • Supply 10 Aruba switches for basic maintenance
  • Supply 20 antennas, connectors, and related components per entity (4 total)
  • Provide managed internal broadband services for existing equipment

Steps to Bid

  1. 1

    Review the RFP document (22949868-FY2027_Fairfield_C2_RFP_.pdf) and the FCC Form 470 (22950726-USAC_FCC_FORM_470_APPLICATION_270005103_CERTIFIED.pdf) for full scope and requirements.

  2. 2

    Submit any technical questions to Cody Stewart, Technology Director, by 1:00 PM local time on December 3, 2026. by Dec 3, 2026, 1:00 PM

  3. 3

    Monitor the E-Rate website for any addenda or clarifications to the RFP.

  4. 4

    Prepare a detailed proposal including line-item pricing, technical descriptions of equivalent products, company certifications, references, E-Rate SPIN number, and a ready-to-execute contract.

  5. 5

    Submit the complete proposal via email to Cody Stewart at [email available with Pro] by 1:00 PM local time on December 31, 2026. by Dec 31, 2026, 1:00 PM

What you'll need

Contract duration

Not specified

Submission

Email

NAICS

541512, 541513

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Vendors must include all related components (e.g., mounting brackets, power cables, multi-year software licenses, basic maintenance). Alternative equipment may be submitted if equivalent in make, model, functionality, and network compatibility. Bidders must include line-item pricing with quantity, manufacturer, part number, description, unit price, and extended price. No equipment from companies deemed a national security risk per FCC Order 19-121 may be included. Answers will be issued via addendum on the E-Rate website. Bidders are responsible for monitoring for updates.

Key dates

Questions due
Dec 3, 2026, 1:00 PM Eastern Time
Bids due
Dec 31, 2026

Documents

  • 22950726-USAC_FCC_FORM_470_APPLICATION_270005103_CERTIFIED.pdf6 pages
  • 22949868-FY2027_Fairfield_C2_RFP_.pdf3 pages

See all documents · Download with Pro

More from this agency

Similar bids near Goshen

Closing soon near Goshen