E-Rate FY2027 Form 470: Network Switches, Cabling, and Related Equipment for 17 School District Sites
El Rancho Unified School DistrictPico Rivera, California#270004863
El Rancho Unified School District is soliciting bids for the replacement of aging network switches at 17 school and district locations. The procurement includes 203 HPE Aruba CX 6300-series switches, power supplies, DAC cabling, and full installation and removal services. Questions must be submitted by December 14, 2026, at 10:00 AM PST. The District reserves the right to reject any or all proposals.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 14, 2027
- Time stated in bid documents
- Jan 14, 2027, 10:00 AM Pacific Time
- Submission
- electronic portal
- Contract term
- 3 years + two additional one-year renewal terms
- Documents analyzed
- 2
Scope of work
- Install 17 10G SFP+ DAC cables and 52 50G SFP56 DAC cables
- Provide 21 primary and 33 redundant power supplies
- Remove and dispose of old switches and cabling
- Configure and test all switches and cabling
- Provide full documentation and closeout reports
Steps to Bid
- 1
Submit all questions via the district’s bid portal by December 14, 2026, at 10:00 AM PST. by Dec 14, 2026, 10:00 AM
- 2
Submit the completed quotation via the district’s bid portal by January 14, 2027, at 10:00 AM PST. by Jan 14, 2027, 10:00 AM
What you'll need
Contract duration
120 calendar days from notice to proceed
Submission
Electronic portal
NAICS
541512, 541519
How to submit
All vendors must submit responses to RFQ via districts bid portal Official linkPro by January 14, 2027 at 10:00 am pst. Any questions regarding this RFQ shall be submitted in writing via the districts bid portal Official linkPro. The District will not respond to email or phone call inquiries. All inquiries must be submitted by December 14, 2026 10:00AM PST. Responses to inquiries will be posted to USACs EPC portal and the district bid portal no later than December 16, 2026.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 9 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The District seeks to replace end-of-life network switches at 17 school and district office locations. Required items include: 203 HPE Aruba CX 6300-series switches (18 aggregation, 185 access), 21 primary and 33 redundant power supplies, 17 10G SFP+ direct attach copper (DAC) cables, 52 50G SFP56 DAC cables, and associated cabling, connectors, and power supplies. All equipment must be new, factory-sealed, and compatible with the District’s existing HPE Aruba management systems. Bidders must provide full installation, configuration, testing, and removal of old equipment. All responses must be submitted via the district’s bid portal at [link available with Pro] by January 14, 2027, at 10:00 AM PST. The earliest allowable contract date is December 15, 2026. The District will not respond to inquiries by email or phone.
Key dates
- Questions due
- Dec 14, 2026, 10:00 AM Pacific Time
- Bids due
- Jan 14, 2027
Documents
- 22946228-USAC_FCC_FORM_470_APPLICATION_270004863_CERTIFIED.pdf6 pages
- 22941484-El_Rancho_USD_RFQ_C2_Equipment_CMAS_NASPO.pdf17 pages
Similar bids near Pico Rivera
- Multifunction Copier or Printer Lease and Maintenance Services · Lakewood · closes Dec 1, 2026
- Prefabricated Office and ADA-Compliant Restroom Replacement at Alhambra Site · Alhambra · closes Dec 15, 2026
- Contracted Hearing Officer Services · Pasadena · closes Dec 7, 2026
- Victory Park Community Center Office Furniture and Reception Partition · Pasadena · closes Dec 2, 2026
- Outdoor Fitness Equipment Installation at Rosewood, Bandini, and Bristow Parks · Commerce · closes Dec 15, 2026
Closing soon near Pico Rivera
- Citywide Janitorial Services · Sierra Madre · closes Nov 25, 2026
- Property Management and Maintenance Services for Las Casitas Affordable Senior Apartment Complex · Irwindale · closes Nov 26, 2026
- Mobile Substation Project · Pasadena · closes Nov 30, 2026
- FY 25-26 & FY 26-27 Street Pavement Rehabilitation Improvement Project · Commerce · closes Nov 30, 2026
- San Jose Creek Trunk Sewer Rehabilitation Phase II · Whittier · closes Dec 1, 2026