OpenRFPCloses Jan 14, 2027

E-Rate FY2027 Form 470: Network Switches, Cabling, and Related Equipment for 17 School District Sites

El Rancho Unified School DistrictPico Rivera, California#270004863

El Rancho Unified School District is soliciting bids for the replacement of aging network switches at 17 school and district locations. The procurement includes 203 HPE Aruba CX 6300-series switches, power supplies, DAC cabling, and full installation and removal services. Questions must be submitted by December 14, 2026, at 10:00 AM PST. The District reserves the right to reject any or all proposals.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Jan 14, 2027
Time stated in bid documents
Jan 14, 2027, 10:00 AM Pacific Time
Submission
electronic portal
Contract term
3 years + two additional one-year renewal terms
Documents analyzed
2

Scope of work

  • Install 17 10G SFP+ DAC cables and 52 50G SFP56 DAC cables
  • Provide 21 primary and 33 redundant power supplies
  • Remove and dispose of old switches and cabling
  • Configure and test all switches and cabling
  • Provide full documentation and closeout reports

Steps to Bid

  1. 1

    Submit all questions via the district’s bid portal by December 14, 2026, at 10:00 AM PST. by Dec 14, 2026, 10:00 AM

  2. 2

    Submit the completed quotation via the district’s bid portal by January 14, 2027, at 10:00 AM PST. by Jan 14, 2027, 10:00 AM

What you'll need

Contract duration

120 calendar days from notice to proceed

Submission

Electronic portal

NAICS

541512, 541519

How to submit

All vendors must submit responses to RFQ via districts bid portal Official linkPro by January 14, 2027 at 10:00 am pst. Any questions regarding this RFQ shall be submitted in writing via the districts bid portal Official linkPro. The District will not respond to email or phone call inquiries. All inquiries must be submitted by December 14, 2026 10:00AM PST. Responses to inquiries will be posted to USACs EPC portal and the district bid portal no later than December 16, 2026.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 9 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The District seeks to replace end-of-life network switches at 17 school and district office locations. Required items include: 203 HPE Aruba CX 6300-series switches (18 aggregation, 185 access), 21 primary and 33 redundant power supplies, 17 10G SFP+ direct attach copper (DAC) cables, 52 50G SFP56 DAC cables, and associated cabling, connectors, and power supplies. All equipment must be new, factory-sealed, and compatible with the District’s existing HPE Aruba management systems. Bidders must provide full installation, configuration, testing, and removal of old equipment. All responses must be submitted via the district’s bid portal at [link available with Pro] by January 14, 2027, at 10:00 AM PST. The earliest allowable contract date is December 15, 2026. The District will not respond to inquiries by email or phone.

Key dates

Questions due
Dec 14, 2026, 10:00 AM Pacific Time
Bids due
Jan 14, 2027

Documents

  • 22946228-USAC_FCC_FORM_470_APPLICATION_270004863_CERTIFIED.pdf6 pages
  • 22941484-El_Rancho_USD_RFQ_C2_Equipment_CMAS_NASPO.pdf17 pages

See all documents · Download with Pro

Similar bids near Pico Rivera

Closing soon near Pico Rivera