Request for Pre-Qualifications | Phase 1 | MP12 B and C - 500 South Capacity Upgrades - CMGC
Salt Lake City CorporationUtah#525003195
The project includes extending 700 South force mains and constructing two of three planned force mains, with major crossings over the Surplus Canal, railroad tracks (SLG&W and UPRR), and I-215. The process is two-step: SOQ evaluation followed by a Request for Proposal. The RFQ Q&A period ends December 2, 2026. The list of qualified contractors will be released December 18, 2026. The project is expected to begin construction in August 2027 and conclude in August 2029.
On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 9, 2026
- Time stated in bid documents
- Dec 9, 2026, 2:00 PM Mountain Time
- Submission
- electronic portal
Steps to Bid
- 1
Attend the Q&A session (if any) and submit questions by 2:00 PM on December 2, 2026 by Dec 2, 2026, 2:00 PM
- 2
Monitor the U3P BONFIRE portal for addenda, updates, and the release of the list of qualified contractors on December 18, 2026
What you'll need
Submission
Electronic portal
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project involves intercepting existing 24-inch diameter 700 South force mains on the north side of the railroad tracks at Gladiola Street (3400 W), extending them to a discharge point upstream of the 500 South Lift Station near Orange Street, and constructing two of the three force mains, with the third to be added as flow conditions demand. The SOQ submission deadline is 2:00 PM on Wednesday, December 9, 2026 (MST). Only SOQs submitted electronically through U3P BONFIRE will be accepted. The selection process is two-step: Step One — evaluation of SOQs to develop a list of the most highly qualified Proposers; Step Two — qualified Proposers will receive a Request for Proposals (RFP) and submit a detailed Proposal. The final ranking will be based on the SOQ and the Proposal. The Request for Qualifications includes selection criteria and process details. The RFQ advertisement date is Wednesday, November 18, 2026. The RFQ question and answer period ends Wednesday, December 2, 2026, at 2:00 PM. A final addendum will be released on Monday, December 7, 2026. The Owner will review SOQs from Thursday, December 10, 2026, to Thursday, December 17, 2026. Applicants must periodically check and download addenda, Q&A responses, and additional information posted during the advertisement period.
Key dates
- Questions due
- Dec 2, 2026, 2:00 PM Mountain Time
- Bids due
- Dec 9, 2026
More from this agency
- 300 SOUTH PAVEMENT MARKINGS · closes Dec 9, 2026
- Rehabilitation of Single-Family Home at 1315 Iola Ave, Salt Lake City, UT · closes Dec 9, 2026
- C12-R15 PRV Replacement - 2026 (514500027) · closes Dec 9, 2026
- Rose Park Golf Course Irrigation and Turf Reduction · closes Dec 16, 2026
- Janitorial Services at City Buildings, Group 2 — Salt Lake City Corporation · closes Dec 18, 2026
Similar bids in Utah
- Transition from GE iFIX SCADA to Inductive Automation Ignition SCADA for JBWRF and District Lift Stations · closes Dec 10, 2026
- Ignition SCADA Integration RFP · closes Dec 10, 2026
- WU015 - College Heights Water, Sewer, and Roadway Construction · Ogden · closes Dec 17, 2026
- Lindon City 800 West Sewer Rehabilitation · Lindon · closes Dec 10, 2026
Closing soon in Utah
- FD2020-22-00242 · closes Nov 28, 2026
- SLCo - CLP090525 - RFC - Fulldome Video Distributors · closes Nov 30, 2026
- Gearbox · closes Dec 1, 2026
- Transportation, Commercial, and Area Lighting Fixtures · closes Dec 1, 2026
- Central Utah 911 - Electrical Power · closes Dec 1, 2026