Request for Proposal: Redesign and Construction Drainage of Asphalt Parking Lot at Kiowa Casino, Devol, Oklahoma
Kiowa Tribe Housing AuthorityCarnegie, Oklahoma#KT-2026-11-KCD
The Kiowa Tribe Transportation Department is soliciting proposals for professional engineering and construction services to redesign and construct drainage for a 475,000 sq ft asphalt parking lot at the Kiowa Casino in Devol, Oklahoma. The work must comply with ODOT standards. Submissions must be emailed to Christina Noel by December 1, 2026, at 4:00 PM CST. The successful bidder must complete TERO compliance and pay the TERO fee before work begins.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 1, 2026, 11:59 PM CT
- Submission
- Documents analyzed
- 1
Scope of work
- Prepare complete PS&E in compliance with ODOT standards
- Provide construction supervision and phased implementation
- Include 3% TERO fee in bid price
Steps to Bid
- 1
Review the full RFP document and understand scope, compliance, and submission requirements
- 2
Submit proposal via email to [email available with Pro] by December 1, 2026, at 4:00 PM CST
What you'll need
Contract duration
To be established; proposed schedule required from offerors
Submission
NAICS
541330, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The scope includes full professional engineering services, preparation of complete plans, specifications, and estimates (PS&E), and construction supervision. Work must comply with the most recent Oklahoma Department of Transportation (ODOT) Standard Specifications for Highway Construction, ODOT Design Manual, and ODOT Drainage Manual. The project will be phased based on public accessibility.
Key dates
- Questions due
- Dec 1, 2026, 4:00 PM Central Time
- Bids due
- Dec 1, 2026, 11:59 PM CT
Documents
- Kiowa_Casino_Devol_Final_RFP_2026.pdf6 pages
More from this agency
- Kiowa Casino Elk Creek Project: Engineering/Design and Construction (Design-Build) · closes Dec 1, 2026
- Kiowa Tribe Office Building Renovation · closes Dec 29, 2026
Closing soon near Carnegie
- Quarterly Subsistence - Eggs, Shell, Whole, Fresh, U.S. Grade A, Medium, 30 Dozen per Case · El Reno · closes Dec 1, 2026
- Quarterly Bread for FCI El Reno · El Reno · closes Dec 2, 2026
- Grady County Temporary Judicial Center - Final Construction Cleaning · Chickasha · closes Dec 3, 2026
- Crimson Creek Golf Course Irrigation Pump Station & Pump House Replacement · El Reno · closes Dec 4, 2026
- Replacement of the Existing Irrigation Pump Station and Pump House at Crimson Creek Golf Course, El Reno, Oklahoma · El Reno · closes Dec 4, 2026