OpenRFPCloses Dec 4, 2026

Long Lake Management District Phosphorus Mitigation for Algae Control

Thurston County — PHSSOlympia, Thurston, Washington#2026-LMD-LGL-1

Thurston County, WA, is soliciting proposals for a four-year algae control project at Long Lake using phosphorus sequestration. The selected contractor will manage adaptive treatments, conduct sediment assessments in both basins, and ensure compliance with Washington State Department of Ecology APAM permit requirements. Work is limited to weekdays, 7 a.m.–5 p.m., via a public boat launch. Proposals must include a detailed work plan, completed forms, and certifications. The maximum contract value is $1,200,000. The County reserves the right to reject any proposal or cancel the solicitation.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 4, 2026
Time stated in bid documents
Dec 3, 2026, 4:00 PM Pacific Time
Submission
mail, hand delivery, email
Contract term
four (4) years + not specified
Documents analyzed
1

Scope of work

  • Target and sequester phosphorus in Long Lake's water column to reduce algal blooms
  • Conduct sediment testing in North and South Basins to assess treatment effectiveness
  • Implement adaptive management with supplemental treatments based on monitoring data
  • Perform compliance monitoring to meet Washington State Department of Ecology APAM permit requirements
  • Coordinate with Long Lake LMD Steering Committee and Thurston County Public Health and Social Services

Steps to Bid

  1. 1

    Submit written pre-proposal inquiries (PPIs) by 4:00 p.m. PST on November 30, 2026, to Kimberly Graham at [email available with Pro]. by Nov 30, 2026, 4:00 PM

  2. 2

    The County will evaluate proposals based on qualifications, experience, past performance, key personnel, work plan, and cost. Interviews may be conducted at the County’s discretion. by Dec 10, 2026

What you'll need

Submission

Mail, Hand delivery, Email

NAICS

541611, 541612

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Thurston County, Washington, seeks a qualified and commercially licensed contractor to provide algae control treatment for Long Lake through phosphorus sequestration. The project aims to reduce the frequency and intensity of cyanobacteria and algal blooms by targeting and sequestering phosphorus in the water column. The Contractor must obtain all necessary permits, coordinate with the Long Lake LMD Steering Committee, and comply with federal, state, and local laws. Work is to be conducted Monday through Friday, 7 a.m. to 5 p.m., with no weekend work permitted due to recreational use. Access is via a public WDFW boat launch. The Contractor will be responsible for shoreline posting, public notification, and reporting to the LMD Steering Committee and County. A detailed work plan must be submitted, including methodology for lake surveys, treatment application, water quality monitoring, public outreach, and sediment core sampling. A completed Certification (Attachment 6) is required.

Key dates

Questions due
Nov 30, 2026, 4:00 PM Pacific Time
Bids due
Dec 4, 2026
Expected award
Jan 14, 2027

Documents

  • RFP-2026-LMD-LGL-1_FINAL_10.12.26.pdf25 pages

See all documents · Download with Pro

More from this agency

Similar bids near Olympia

Closing soon near Olympia