Request for Proposal (RFP) Project #2027-01: New Stand-Alone Propane Fueling Station Infrastructure

Harbor TransitGrand Haven, Michigan

The scope includes two 1,990-gallon propane storage tanks, four commercial-grade dispensers, integrated fuel management system, foundations, piping, safety systems, and bollards. The contractor is responsible for all permits, inspections, training, and site restoration. Submissions are due by 4:00 PM ET on December 9, 2026, to Scott Borg at 440 North Ferry Street, Grand Haven, MI 49417. Questions must be submitted by November 4, 2026, at 12:00 PM ET.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 9, 2026
Time stated in bid documents
Dec 9, 2026, 4:00 PM Eastern Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Contract term
120 calendar days from Notice to Proceed
Documents analyzed
3 published · 2 analyzed

Scope of work

  • Furnish and install two 1,990-gallon aboveground propane storage tanks
  • Install four commercial-grade propane dispensers (12 gal/min capacity)
  • Provide integrated fuel management and authorization system with driver/bus ID and odometer entry
  • Install foundations, piping, safety controls, and bollards

Steps to Bid

  1. 1

    Review the full RFP document and all attachments, including the utility plan and electrical site plan.

  2. 2

    Attend the virtual pre-proposal meeting on October 30, 2026, at 11:00 AM ET (optional but recommended). was Oct 30, 2026, 11:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Ensure the proposal is received by 4:00 PM ET on December 9, 2026, at the address provided. by Dec 9, 2026, 4:00 PM

What you'll need

Submission

Mail, Hand delivery

NAICS

237130, 237199

How to submit

Proposals must be submitted in sealed envelopes clearly labeled 'Stand-Alone Propane Fueling Infrastructure Proposal' and delivered to Scott Borg, Transportation Director, at the address above. No facsimile proposals will be accepted. Proposals must be received by 4:00 PM ET on December 9, 2026.

In person/mail: 440 North Ferry Street, Grand Haven, MI 49417

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The selected contractor shall furnish, deliver, install, test, and commission a complete, fully operational propane fueling system, including two (2) 1,990-gallon aboveground propane storage tanks, four (4) commercial-grade propane dispensers capable of delivering at least 12 gallons per minute, low-emission EURO-style dispensing nozzles, all associated mechanical, electrical, piping, pumping, controls, communications, and monitoring equipment, and an integrated fuel management and authorization system with driver and bus identification and odometer entry. The contractor shall also install foundations for tank saddles, underground and aboveground piping, pumping units, hose retractors, emergency shutdown devices, leak detection equipment, safety controls, signage, grounding and bonding systems, spill protection features, and approximately 28 six-inch steel bollards. The system must support simultaneous fueling of two buses on both sides of the island. The contractor shall design and install subgrade supports and foundations for fuel tanks, pumps, and other equipment. Electrical and data pathways must be installed as required, with any additional pathways the contractor’s responsibility. The contractor shall maintain responsibility for trenching and site restoration. The contractor must submit a bid guarantee equal to 5% of the total proposal price, and performance and payment bonds of 100% of the contract price are required. Late proposals will not be considered. Answers will be posted on November 9, 2026, at [link available with Pro]. A virtual pre-proposal meeting is scheduled for October 30, 2026, at 11:00 AM ET, but attendance is not mandatory.

Key dates

Questions due
Nov 4, 2026, 12:00 PM Eastern Time
Pre-bid meeting
Oct 30, 2026, 11:00 AM Eastern Time
Bids due
Dec 9, 2026

Documents

  • harbor_propane_infrastructure_rfp_-_pco_edits_final.pdf38 pages
  • 10_-_c402_enlarged_utility_plan.pdf1 pages
  • es101_-_electrical_site_plan.pdf

See all documents · Download with Pro

Closing soon near Grand Haven