Request for Proposals: Downtown Bloomington Corridor and Subarea Planning Study with Shared Street Design on Kirkwood Avenue
City of Bloomington PlanningBloomington Planning, Indiana
The City of Bloomington is seeking qualified multidisciplinary consultant teams to conduct a planning and design study for a shared street on Kirkwood Avenue in downtown Bloomington. The scope includes a comprehensive plan update, safety recommendations, economic assessment, and a conceptual design. Questions must be submitted by December 2, 2026, at 5:00 PM ET. The project is funded in part by the USDOT SS4A Grant Program with a maximum budget of $500,000.
On PublicBidSearch: the newspaper notice and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 10, 2026
- Time stated in bid documents
- Dec 10, 2026, 5:00 PM Eastern Time
- Submission
- electronic portal
Scope of work
- Develop transportation safety recommendations
- Create engineering-ready conceptual design for shared street on Kirkwood Avenue
- Comply with USDOT SS4A grant program requirements
Steps to Bid
- 1
Review the full RFP documents, submittal guidelines, and any addenda available on the City's OpenGov Procurement portal: Official linkPro
- 2
Submit written questions by December 2, 2026, at 5:00 PM ET to Ryan Robling, Planning Services Manager, via email at [email available with Pro] by Dec 2, 2026, 5:00 PM
- 3
Prepare and submit a complete electronic proposal in PDF format via the OpenGov portal by Thursday, December 10, 2026, at 5:00 PM ET by Dec 10, 2026, 5:00 PM
What you'll need
Submission
Electronic portal
NAICS
541330
How to submit
Proposals must be submitted electronically via the OpenGov portal. Format: PDF. No physical submissions accepted.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The City of Bloomington Planning and Transportation Department is soliciting competitive electronic proposals from qualified multidisciplinary consultant teams to develop the Downtown Bloomington Corridor and Subarea Planning Study. The project is partially funded through the U.S. Department of Transportation (USDOT) Safety Streets and Roads for All (SS4A) Grant Program, with an assumed project budget not to exceed $500,000. Proposals must be submitted electronically via the OpenGov portal by Thursday, December 10, 2026, at 5:00 PM ET. Equal Opportunity/Title VI/Federal Grant Rules Apply.
Key dates
- Questions due
- Dec 2, 2026, 5:00 PM Eastern Time
- Bids due
- Dec 10, 2026
Similar open bids
- Procurement of Design and Production of Flat Railcars — DEPT OF THE NAVY
- Rehabilitate Runway 15-33 — Indianapolis Airport Authority
- Reinstall and Validation of the Meridian IV Scanning Optical Microscope — DEPT OF THE NAVY
- HMA Overlay, Preventive Maintenance - Main Street (Former SR56) from SR 62 to McIntire Street Phase 1, Jefferson County — Indiana DOT
- Environmental Services Division Support — RFP 2611-02 — Indiana Department of Transportation
Closing this week nearby
- Herrick Acoustics ACG-3 Refrigeration System Replacement — closes Nov 19, 2026
- Brown Lab Rooms B183A, B171A and B175B Renovation — closes Nov 19, 2026
- Real Estate Services — RFP 27-87884 — closes Nov 19, 2026
- Sanitary Sewer Repair at 1608 Broadway, City of Gary, IN — closes Nov 19, 2026
- Chaffee Hall and Zucrow Labs Road Rehabilitation - 2026 — closes Nov 19, 2026