Construction Design Services for Seawall and Citizens’ Dock, Pier 1
Crescent City Harbor DistrictCrescent City, California
Services include 60% and 100% construction-ready design drawings. Key deliverables include design drawings, specifications, and calculations. The Engineer of Record must be a California-licensed P.E. with marine infrastructure experience. A pre-proposal conference call is scheduled for August 6, 2026, at 10:00 AM. Written questions are due August 10, 2026.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 2, 2026
- Submission
- Documents analyzed
- 3
Scope of work
- Prepare 60% and 100% construction-ready design drawings for a new Seawall and Citizens’ Dock, Pier 1.
- The 60% submittal will include structural systems, geometry, materials, and primary design loads.
- The 100% submittal will be a complete, permit-ready, and contractor-biddable construction document set.
- Project includes demolition of old seawall and construction of new seawall and dock.
Steps to Bid
- 1
Attend Pre-Proposal Conference Call was Aug 6, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
Zoom link: [link available with Pro] UT.1 Meeting ID: 837 5223 5975 Passcode: 553250 Mobile: 1-669-900-6833
- 2
Schedule a site tour (optional)
Contact [email available with Pro] to schedule.
- 3
Submit Written Questions was Aug 10, 2026
This date has passed — confirm eligibility with the agency before bidding.
Submit questions via email to [email available with Pro]. Mark proprietary information 'CONFIDENTIAL'.
What you'll need
Submission
How to submit
Responses may be submitted via email to [email available with Pro].
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The 60% submittal will define structural systems, geometry, materials, and primary design loads, intended for CCHD and regulatory agency review. The work involves demolition of the old seawall, construction of a new seawall to protect Citizen’s Dock Road, repair of the seafood packing and trucking area, and construction of a new 13,760 sq ft concrete decked dock designed to withstand 50-year tsunami event tidal surges. The project also includes installing electrical, sewer, water, and mechanical infrastructure for the dock businesses and installing new/refurbished hoists. Initial design documents, NEPA, and CEQA have been completed, and the construction permit application process has started.
Key dates
- Questions due
- Aug 10, 2026
- Pre-bid meeting
- Aug 6, 2026, 10:00 AM Pacific Time
- Bids due
- Dec 2, 2026
Documents
- CCHD_RFP_Construction_Design_Services.pdf61 pages
- Publication_of_Answers_to_Construction_Design_RFP.pdf3 pages
- CCHD_RFP_-_10-Year_Strategic_Plan_-v.2026.11.pdf32 pages